Mark Gellman and Ray Mormann secure a window in the dining area on 7/20/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Threshold reinstalled 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Trim near threshold back in place 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Looking toward the rear of the corridor which passes by the galley 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The corner has been cleaned and painted 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Mark Gellman and Ray Mormann secure a window in the dining area on 7/20/13 - Pauline Trabert (trabert)
Viewed: 100 times.
Threshold reinstalled 7/14/13 - Pauline Trabert (trabert)
Viewed: 83 times.
Trim near threshold back in place 7/14/13 - Pauline Trabert (trabert)
Viewed: 90 times.
Looking toward the rear of the corridor which passes by the galley 7/14/13 - Pauline Trabert (trabert)
Viewed: 89 times.
The corner has been cleaned and painted 7/14/13 - Pauline Trabert (trabert)
Viewed: 82 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shelly Vanderschaegen vacuuming the galley floor 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Pauline Trabert helping clean the galley 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic cleaning the corner walls 7/7/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Corrugated steel reapplied over the repaired floor.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Corrugated steel was relaid over the new plywood.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Shelly Vanderschaegen vacuuming the galley floor 7/14/13 - Pauline Trabert (trabert)
Viewed: 92 times.
Pauline Trabert helping clean the galley 7/14/13 - Pauline Trabert (trabert)
Viewed: 100 times.
Mike Baksic cleaning the corner walls 7/7/13 - Pauline Trabert (trabert)
Viewed: 95 times.
Corrugated steel reapplied over the repaired floor. - Pauline Trabert (trabert)
Viewed: 97 times.
Corrugated steel was relaid over the new plywood. - Pauline Trabert (trabert)
Viewed: 102 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
New plywood was laid in the hall over the sealant.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The first piece of plywood in place over the concrete by the door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Ray Mormann spraying black rubberized sealer over the hall area.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The concrete application by the door is done.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Here Mike points to a hole he has missed.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
New plywood was laid in the hall over the sealant. - Pauline Trabert (trabert)
Viewed: 89 times.
The first piece of plywood in place over the concrete by the door. - Pauline Trabert (trabert)
Viewed: 95 times.
Ray Mormann spraying black rubberized sealer over the hall area. - Pauline Trabert (trabert)
Viewed: 98 times.
The concrete application by the door is done. - Pauline Trabert (trabert)
Viewed: 98 times.
Here Mike points to a hole he has missed. - Pauline Trabert (trabert)
Viewed: 99 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Two and a half bags later the last batch of concrete was mixed for the door area.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
More concrete troweling in the Birmingham.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic troweling the area in front of the Birmingham galley door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
About 2 hours into the project on the Birmingham floor repair.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Working the concrete between the steel and wood to make it more supportive.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Two and a half bags later the last batch of concrete was mixed for the door area. - Pauline Trabert (trabert)
Viewed: 113 times.
More concrete troweling in the Birmingham. - Pauline Trabert (trabert)
Viewed: 101 times.
Mike Baksic troweling the area in front of the Birmingham galley door. - Pauline Trabert (trabert)
Viewed: 99 times.
About 2 hours into the project on the Birmingham floor repair. - Pauline Trabert (trabert)
Viewed: 89 times.
Working the concrete between the steel and wood to make it more supportive. - Pauline Trabert (trabert)
Viewed: 93 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
A closer look at the first application of cement.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike applies the first batch of concrete to the area in front of the door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike is piecing in more reinforcement in the area where concrete is to be applied.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham hall after vacuuming.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic applied more metal reinforcement because there wasn't yet enough.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
A closer look at the first application of cement. - Pauline Trabert (trabert)
Viewed: 86 times.
Mike applies the first batch of concrete to the area in front of the door. - Pauline Trabert (trabert)
Viewed: 102 times.
Mike is piecing in more reinforcement in the area where concrete is to be applied. - Pauline Trabert (trabert)
Viewed: 88 times.
Birmingham hall after vacuuming. - Pauline Trabert (trabert)
Viewed: 83 times.
Mike Baksic applied more metal reinforcement because there wasn't yet enough. - Pauline Trabert (trabert)
Viewed: 93 times.