Atlantic Coast Line Birmingham 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mark Gellman and Ray Mormann secure a window in the dining area on 7/20/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Threshold reinstalled 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Trim near threshold back in place 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Looking toward the rear of the corridor which passes by the galley 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Mark Gellman and Ray Mormann secure a window in the dining area on 7/20/13 - Pauline Trabert (trabert)
Viewed: 1242 times.
Threshold reinstalled 7/14/13 - Pauline Trabert (trabert)
Viewed: 1065 times.
Trim near threshold back in place 7/14/13 - Pauline Trabert (trabert)
Viewed: 1120 times.
Looking toward the rear of the corridor which passes by the galley 7/14/13 - Pauline Trabert (trabert)
Viewed: 1159 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The corner has been cleaned and painted 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shelly Vanderschaegen vacuuming the galley floor 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Pauline Trabert helping clean the galley 7/14/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic cleaning the corner walls 7/7/13
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
The corner has been cleaned and painted 7/14/13 - Pauline Trabert (trabert)
Viewed: 1080 times.
Shelly Vanderschaegen vacuuming the galley floor 7/14/13 - Pauline Trabert (trabert)
Viewed: 1071 times.
Pauline Trabert helping clean the galley 7/14/13 - Pauline Trabert (trabert)
Viewed: 1119 times.
Mike Baksic cleaning the corner walls 7/7/13 - Pauline Trabert (trabert)
Viewed: 1100 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Corrugated steel reapplied over the repaired floor.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Corrugated steel was relaid over the new plywood.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
New plywood was laid in the hall over the sealant.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The first piece of plywood in place over the concrete by the door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Corrugated steel reapplied over the repaired floor. - Pauline Trabert (trabert)
Viewed: 1125 times.
Corrugated steel was relaid over the new plywood. - Pauline Trabert (trabert)
Viewed: 1111 times.
New plywood was laid in the hall over the sealant. - Pauline Trabert (trabert)
Viewed: 1087 times.
The first piece of plywood in place over the concrete by the door. - Pauline Trabert (trabert)
Viewed: 1129 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Ray Mormann spraying black rubberized sealer over the hall area.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The concrete application by the door is done.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Here Mike points to a hole he has missed.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Two and a half bags later the last batch of concrete was mixed for the door area.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Ray Mormann spraying black rubberized sealer over the hall area. - Pauline Trabert (trabert)
Viewed: 1140 times.
The concrete application by the door is done. - Pauline Trabert (trabert)
Viewed: 1106 times.
Here Mike points to a hole he has missed. - Pauline Trabert (trabert)
Viewed: 1122 times.
Two and a half bags later the last batch of concrete was mixed for the door area. - Pauline Trabert (trabert)
Viewed: 1340 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
More concrete troweling in the Birmingham.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic troweling the area in front of the Birmingham galley door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
About 2 hours into the project on the Birmingham floor repair.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Working the concrete between the steel and wood to make it more supportive.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
More concrete troweling in the Birmingham. - Pauline Trabert (trabert)
Viewed: 1088 times.
Mike Baksic troweling the area in front of the Birmingham galley door. - Pauline Trabert (trabert)
Viewed: 1102 times.
About 2 hours into the project on the Birmingham floor repair. - Pauline Trabert (trabert)
Viewed: 1060 times.
Working the concrete between the steel and wood to make it more supportive. - Pauline Trabert (trabert)
Viewed: 1068 times.
Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM