Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Atlantic Coast Line Birmingham 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
After vacuuming, pieces of metal were placed to hold the concrete to come.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Another view of the damage in front of the door in the galley area of the Birmingham prior to vacuuming debris.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
From the opposite end of the hall looking at the damaged floor to be repaired.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Water got to the wood and it disintegrated over time.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Down to the base after Mike Baksic and Ray Mormann removed the linoleum and wood underneath.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
After vacuuming, pieces of metal were placed to hold the concrete to come. - Pauline Trabert (trabert)
Viewed: 46 times.
Another view of the damage in front of the door in the galley area of the Birmingham prior to vacuuming debris. - Pauline Trabert (trabert)
Viewed: 40 times.
From the opposite end of the hall looking at the damaged floor to be repaired. - Pauline Trabert (trabert)
Viewed: 39 times.
Water got to the wood and it disintegrated over time. - Pauline Trabert (trabert)
Viewed: 43 times.
Down to the base after Mike Baksic and Ray Mormann removed the linoleum and wood underneath. - Pauline Trabert (trabert)
Viewed: 38 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The cabinet was returned to it's place but not installed since it needed to be raised a bit.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham Floor Work June 15, 2013 - The metal floor was reinstalled.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The metal floor was reinstalled - note that there is a cabinet missing as it probably had been removed when the ice cream parlor had installed the door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shelly Vanderschaegen wire wheeling the last piece of the flooring to place
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
This is the before picture showing the poor condition of the material under the metal floor.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
The cabinet was returned to it's place but not installed since it needed to be raised a bit. - Pauline Trabert (trabert)
Viewed: 53 times.
Birmingham Floor Work June 15, 2013 - The metal floor was reinstalled. - Pauline Trabert (trabert)
Viewed: 56 times.
The metal floor was reinstalled - note that there is a cabinet missing as it probably had been removed when the ice cream parlor had installed the door. - Pauline Trabert (trabert)
Viewed: 51 times.
Shelly Vanderschaegen wire wheeling the last piece of the flooring to place - Pauline Trabert (trabert)
Viewed: 44 times.
This is the before picture showing the poor condition of the material under the metal floor. - Pauline Trabert (trabert)
Viewed: 53 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham Floor Work June 15, 2013 - concrete that Mike and Shelly poured on Friday night
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Ray Mormann sprayed the floor with a rubberized spray to help preserve the wood under the plywood to be installed next.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
After the rubberized spray, plywood was then cut and installed in the car.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham Floor Work June 15, 2013 - Plywood was cut and installed in the car.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Birmingham Floor Work June 15, 2013 - concrete that Mike and Shelly poured on Friday night - Pauline Trabert (trabert)
Viewed: 50 times.
Ray Mormann sprayed the floor with a rubberized spray to help preserve the wood under the plywood to be installed next. - Pauline Trabert (trabert)
Viewed: 55 times.
After the rubberized spray, plywood was then cut and installed in the car. - Pauline Trabert (trabert)
Viewed: 52 times.
Birmingham Floor Work June 15, 2013 - Plywood was cut and installed in the car. - Pauline Trabert (trabert)
Viewed: 80 times.
Powered by Gallery.
Copyright © 1995-2014, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM