CRIP 19135 TRANSFER CABOOSE  

transpixel
transpixel 07.15.07 - THE REPLACEMENT FLOORING AT THE B END DOOR THRESHOLD HAS BEEN INSTALLED, REPLACING THE ROTTED WOOD UNDER THE DIAMOND PLATE. transpixel
transpixel

07.15.07 - THE REPLACEMENT FLOORING AT THE B END DOOR THRESHOLD HAS BEEN INSTALLED, REPLACING THE ROTTED WOOD UNDER THE DIAMOND PLATE. - Kirk L. Warner (kwarner)


Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM