CRIP 19135 TRANSFER CABOOSE 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.23.07 - KIRK WARNER HUNG THE B END DOOR.  THEN HE APPLIED THE LOCKSET AND SECURITY BAR ON THE INTERIOR, AND PAINTED THE RECENTLY APPLIED EXTERIOR DOOR TRIM, LOCK HANDLE AND PLATE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.26.07 - GERRY DETTLOFF WELDS IN A BRACE THAT WILL KEEP THE HANDBRAKE FROM BENDING THE ENDSILL WHENEVER THE HANDBRAKE IS SET.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.23.07 - ALL OF THE METAL WHICH WAS NEEDLE CHIPPED AND PRIMED YESTERDAY, RECEIVED FINSIH PAINT APPLICATION BY DICK CUBBAGE.  THE FIRST COAT OF YELLOW WAS APPLIED TO MANY OF THE HANDRAILS ON THE B END BY KIRK WARNER.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.26.07 - THE REMAINING, UNREFINISHED INTERIOR PANELS HAVE ALL BEEN SANDED AND A COAT OF PRIMER HAS BEEN APPLIED.  THE DAMAGED AREAS WILL NOW HAVE TO BE REPAIRED WITH WOOD FILLER, SANDED AND PRIMED, BEFORE THE FINAL COAT OF PAINT IS APPLIED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.23.07 - KIRK WARNER HUNG THE B END DOOR. THEN HE APPLIED THE LOCKSET AND SECURITY BAR ON THE INTERIOR, AND PAINTED THE RECENTLY APPLIED EXTERIOR DOOR TRIM, LOCK HANDLE AND PLATE. - Kirk L. Warner (kwarner)
Viewed: 1746 times.
09.26.07 - GERRY DETTLOFF WELDS IN A BRACE THAT WILL KEEP THE HANDBRAKE FROM BENDING THE ENDSILL WHENEVER THE HANDBRAKE IS SET.
- Kirk L. Warner (kwarner)
Viewed: 1765 times.
09.23.07 - ALL OF THE METAL WHICH WAS NEEDLE CHIPPED AND PRIMED YESTERDAY, RECEIVED FINSIH PAINT APPLICATION BY DICK CUBBAGE. THE FIRST COAT OF YELLOW WAS APPLIED TO MANY OF THE HANDRAILS ON THE B END BY KIRK WARNER. - Kirk L. Warner (kwarner)
Viewed: 1961 times.
09.26.07 - THE REMAINING, UNREFINISHED INTERIOR PANELS HAVE ALL BEEN SANDED AND A COAT OF PRIMER HAS BEEN APPLIED. THE DAMAGED AREAS WILL NOW HAVE TO BE REPAIRED WITH WOOD FILLER, SANDED AND PRIMED, BEFORE THE FINAL COAT OF PAINT IS APPLIED. - Kirk L. Warner (kwarner)
Viewed: 1749 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.26.07 - THE BRACE, THE VERTICAL CHANNEL TO THE RIGHT OF THE DRAFTSILL, HAS BEEN, WELDED, WIREWHEELED, PRIMED AND FINISH PAINTED.  THE APPLICATION OF MORE DECK BOARDS CAN CONTINUE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.26.07 - FOUR MORE DECK BOARDS ARE NOW IN PLACE AND WILL BE SECURED SATURDAY, WHEN ADDTIONAL HELP IS AVAILABLE.  THE HANDRAIL FROM THE CABOOSE HOUSE TO THE BR LADDER AREA, SEEN BEHIND THE HANDBRAKE WHEEL, WAS REPAIRED AND CAN NOW BE SECURED, NEEDLE CHIPPED AND PAINTED. AN INSERT TO THE HORIZONTAL PORTION OF THE ENDSILL NEEDS TO BE WELDED IN PLACE BEFORE THE LAST DECK BOARD CAN BE FIT AND SECURED TO THE DECK.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.28.07 - THE BASEBOARD AND THE QUARTER ROUND TRIM WERE BACK PRIMED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.28.07 - THE DEFECTS IN THE WALLS WERE FILLED WITH WOOD FILLER.  SOME OF THE BASEBOARD HAS BEEN APPLIED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.26.07 - THE BRACE, THE VERTICAL CHANNEL TO THE RIGHT OF THE DRAFTSILL, HAS BEEN, WELDED, WIREWHEELED, PRIMED AND FINISH PAINTED. THE APPLICATION OF MORE DECK BOARDS CAN CONTINUE. - Kirk L. Warner (kwarner)
Viewed: 1648 times.
09.26.07 - FOUR MORE DECK BOARDS ARE NOW IN PLACE AND WILL BE SECURED SATURDAY, WHEN ADDTIONAL HELP IS AVAILABLE. THE HANDRAIL FROM THE CABOOSE HOUSE TO THE BR LADDER AREA, SEEN BEHIND THE HANDBRAKE WHEEL, WAS REPAIRED AND CAN NOW BE SECURED, NEEDLE CHIPPED AND PAINTED. AN INSERT TO THE HORIZONTAL PORTION OF THE ENDSILL NEEDS TO BE WELDED IN PLACE BEFORE THE LAST DECK BOARD CAN BE FIT AND SECURED TO THE DECK. - Kirk L. Warner (kwarner)
Viewed: 1678 times.
09.28.07 - THE BASEBOARD AND THE QUARTER ROUND TRIM WERE BACK PRIMED. - Kirk L. Warner (kwarner)
Viewed: 1641 times.
09.28.07 - THE DEFECTS IN THE WALLS WERE FILLED WITH WOOD FILLER. SOME OF THE BASEBOARD HAS BEEN APPLIED. - Kirk L. Warner (kwarner)
Viewed: 1650 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.28.07 - AFTER THE WOOD FILLER WAS DRY, THE AREAS WERE SANDED TO MAKE THEM READY FOR TOUCH UP PRIMING.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.29.07 - ROD TURNER WELDS AN INSERT TO THE ENDSILL WHERE IT HAD FAILED.  NOW THE LAST TWO DECK BOARDS CAN BE APPLIED.  ROD ALSO REPAIRED THE CRACKS ON THE HANDBRAKE SUPPORT STRUCTURE BY WELDING.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.29.07 -  VICTOR HUMPHREYS ASSISTS BOB KUTELLA IN POSITIONING THE ROCK ISLAND HERALD STENCIL SO THAT BOB CAN TRACE IT ON THE SIDE OF THE CAR.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.29.07 - BY THE END OF THE DAY, BOB HAD APPLIED ABOUT 70% OF THE HERALD.  THE BLUE TAPE OUTLINES SOME OF THE STRAIGHT SECTIONS OF THE LETTERS AND SPEEDS UP THE PAINTING.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.28.07 - AFTER THE WOOD FILLER WAS DRY, THE AREAS WERE SANDED TO MAKE THEM READY FOR TOUCH UP PRIMING. - Kirk L. Warner (kwarner)
Viewed: 1626 times.
09.29.07 - ROD TURNER WELDS AN INSERT TO THE ENDSILL WHERE IT HAD FAILED. NOW THE LAST TWO DECK BOARDS CAN BE APPLIED. ROD ALSO REPAIRED THE CRACKS ON THE HANDBRAKE SUPPORT STRUCTURE BY WELDING. - Kirk L. Warner (kwarner)
Viewed: 1731 times.
09.29.07 - VICTOR HUMPHREYS ASSISTS BOB KUTELLA IN POSITIONING THE ROCK ISLAND HERALD STENCIL SO THAT BOB CAN TRACE IT ON THE SIDE OF THE CAR. - Kirk L. Warner (kwarner)
Viewed: 1628 times.
09.29.07 - BY THE END OF THE DAY, BOB HAD APPLIED ABOUT 70% OF THE HERALD. THE BLUE TAPE OUTLINES SOME OF THE STRAIGHT SECTIONS OF THE LETTERS AND SPEEDS UP THE PAINTING. - Kirk L. Warner (kwarner)
Viewed: 1744 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.27.07 - KIRK WARNER AND VICTOR HUMPHREYS HAVE SECURED THE HANDRAILS TO THE DECK AND FIVE MORE DECK BOARDS HAVE BEEN SECURED.  OTHERS RECEIVED THEIR FINAL TIGHTENING.  TWO DECK BOARDS REMAIN TO BE APPLIED.  ALL WOOD REPLACEMENT, EXCEPT FOR TRIM IN THE CABIN, WILL THEN BE COMPLETED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.30.07 - RAY POLLICE NEEDLE CHIPS THE RIGHT SIDE OF THE B TRUCK.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.30.07 - KIRK WARNER HAS REAPPLIED THE INSULLATION AND HEAT SHIELD BEHIND THE STOVE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.30.07 - THE ENDSILL IS BENT BADLY AND THE FINAL DECK BOARD HAD TO BE SCRIBED AND CUT TO FIT.  THE BOARD HAS NOT BEEN PLACED IN ITS FINAL POSITION AGAINST THE ENDSILL.  DADOS HAD TO BE CUT FOR PROTRUDING RIVETS ON THE BOTTOM OF THE BOARD AND HOLES HAD TO BE DRILLED FOR RIVETS WHICH PROTRUDED ON THE ENDS AND ONE EDGE OF THE DECK BOARD.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.27.07 - KIRK WARNER AND VICTOR HUMPHREYS HAVE SECURED THE HANDRAILS TO THE DECK AND FIVE MORE DECK BOARDS HAVE BEEN SECURED. OTHERS RECEIVED THEIR FINAL TIGHTENING. TWO DECK BOARDS REMAIN TO BE APPLIED. ALL WOOD REPLACEMENT, EXCEPT FOR TRIM IN THE CABIN, WILL THEN BE COMPLETED. - Kirk L. Warner (kwarner)
Viewed: 1681 times.
09.30.07 - RAY POLLICE NEEDLE CHIPS THE RIGHT SIDE OF THE B TRUCK. - Kirk L. Warner (kwarner)
Viewed: 1663 times.
09.30.07 - KIRK WARNER HAS REAPPLIED THE INSULLATION AND HEAT SHIELD BEHIND THE STOVE. - Kirk L. Warner (kwarner)
Viewed: 1717 times.
09.30.07 - THE ENDSILL IS BENT BADLY AND THE FINAL DECK BOARD HAD TO BE SCRIBED AND CUT TO FIT. THE BOARD HAS NOT BEEN PLACED IN ITS FINAL POSITION AGAINST THE ENDSILL. DADOS HAD TO BE CUT FOR PROTRUDING RIVETS ON THE BOTTOM OF THE BOARD AND HOLES HAD TO BE DRILLED FOR RIVETS WHICH PROTRUDED ON THE ENDS AND ONE EDGE OF THE DECK BOARD. - Kirk L. Warner (kwarner)
Viewed: 1712 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.30.07 - THE FINAL TWO DECK BOARDS HAVE BEEN FIT AND BOLTED INTO PLACE.  ALL OF THE HANDRAIL BRACKETS ARE ALSO NOW BOLTED TO THE DECK BOARDS.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.30.07 - KIRK WARNER HAS MADE AND APPLIED TRIM TO THE INTERIOR OF THE RIGHT WINDOW
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.30.07 - BOB KUTELLA HAS NOW FINSIHED THE HERALD ON THE RIGHT SIDE OF THE CAR.  THE CAR NOW LOOKS EXCELLENT.  THIS WILL BE THE LAST UPDATE UNTIL NOVEMBER 4TH AS I WILL BE OUT OF TOWN.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
11.04.07 - THE REMAINING PORTIONS OF THE ENDSILL HAVE BEEN NEEDLE CHIPPED, WIRE WHEELED AND PAINTED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.30.07 - THE FINAL TWO DECK BOARDS HAVE BEEN FIT AND BOLTED INTO PLACE. ALL OF THE HANDRAIL BRACKETS ARE ALSO NOW BOLTED TO THE DECK BOARDS. - Kirk L. Warner (kwarner)
Viewed: 1747 times.
09.30.07 - KIRK WARNER HAS MADE AND APPLIED TRIM TO THE INTERIOR OF THE RIGHT WINDOW - Kirk L. Warner (kwarner)
Viewed: 1763 times.
09.30.07 - BOB KUTELLA HAS NOW FINSIHED THE HERALD ON THE RIGHT SIDE OF THE CAR. THE CAR NOW LOOKS EXCELLENT. THIS WILL BE THE LAST UPDATE UNTIL NOVEMBER 4TH AS I WILL BE OUT OF TOWN. - Kirk L. Warner (kwarner)
Viewed: 1941 times.
11.04.07 - THE REMAINING PORTIONS OF THE ENDSILL HAVE BEEN NEEDLE CHIPPED, WIRE WHEELED AND PAINTED. - Kirk L. Warner (kwarner)
Viewed: 1715 times.
Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM