The 1100 is spotted on the connector track during switching on May 1, 2010. The pantograph will be installed at the end of the roof to the right in this photo; the pan supports are still in place. Note that the rotating platform and tool boxes have already been reinstalled on the roof since the 1100 arrived in January.