| | | |
|
|
|
|
Rivet test heated - Nigel Bennett (nbennett) Viewed: 1126 times.
|
A lot of tubes ground to size - Nigel Bennett (nbennett) Viewed: 1155 times.
|
Wires for lagging in place on boiler barrel - Nigel Bennett (nbennett) Viewed: 1184 times.
|
Eric takes a break from tube grinding - Nigel Bennett (nbennett) Viewed: 1145 times.
|
| | | |
| | | |
|
|
|
|
Rivets to be fitted - Nigel Bennett (nbennett) Viewed: 1192 times.
|
Two done at the front - Nigel Bennett (nbennett) Viewed: 1150 times.
|
Four complete at the front - Nigel Bennett (nbennett) Viewed: 1174 times.
|
The hot rivet is placed - Nigel Bennett (nbennett) Viewed: 1107 times.
|
| | | |
| | | |
|
|
|
|
Air hammer goes on - Nigel Bennett (nbennett) Viewed: 1126 times.
|
Hammering complete - see how far it is compressed - Nigel Bennett (nbennett) Viewed: 1123 times.
|
The finished rivet head - Nigel Bennett (nbennett) Viewed: 1121 times.
|
Ten in place three to go - Nigel Bennett (nbennett) Viewed: 1141 times.
|
| | | |
| | | |
|
|
|
|
Work starts on the smokebox ring - Nigel Bennett (nbennett) Viewed: 1140 times.
|
Paul works on the smokebox front - Nigel Bennett (nbennett) Viewed: 1217 times.
|
First fittings on the backhead - Nigel Bennett (nbennett) Viewed: 1099 times.
|
Engineer's glass in place - Nigel Bennett (nbennett) Viewed: 1126 times.
|
| | | |
| | | |
|
|
|
|
All rivets in place - Nigel Bennett (nbennett) Viewed: 1170 times.
|
Main control valve for the turret - Nigel Bennett (nbennett) Viewed: 1091 times.
|
Body of the turret valve - Nigel Bennett (nbennett) Viewed: 1078 times.
|
Valve seat in the turret - Nigel Bennett (nbennett) Viewed: 1132 times.
|
| | | |