Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Frisco 1630 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The smokebox is now ready for new bolts
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
All flexi stays to be tseted are now marked
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Debris collects in the socket of the stay
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
So the socket must be cleaned before testing
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
The smokebox is now ready for new bolts - Nigel Bennett (nbennett)
Viewed: 170 times.
All flexi stays to be tseted are now marked - Nigel Bennett (nbennett)
Viewed: 150 times.
Debris collects in the socket of the stay - Nigel Bennett (nbennett)
Viewed: 169 times.
So the socket must be cleaned before testing - Nigel Bennett (nbennett)
Viewed: 163 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Superheater element bolts before
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
and after cleaning and checking
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Glenn turns the taper on a safe end
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Ed works on the new lubricator piping
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Superheater element bolts before - Nigel Bennett (nbennett)
Viewed: 158 times.
and after cleaning and checking - Nigel Bennett (nbennett)
Viewed: 153 times.
Glenn turns the taper on a safe end - Nigel Bennett (nbennett)
Viewed: 148 times.
Ed works on the new lubricator piping - Nigel Bennett (nbennett)
Viewed: 149 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First two flues now safe ended
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Motion brackets now cleaned for repainting
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Cylinders now well under way
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Boiler insulation stored ready to install
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
First two flues now safe ended - Nigel Bennett (nbennett)
Viewed: 136 times.
Motion brackets now cleaned for repainting - Nigel Bennett (nbennett)
Viewed: 144 times.
Cylinders now well under way - Nigel Bennett (nbennett)
Viewed: 135 times.
Boiler insulation stored ready to install - Nigel Bennett (nbennett)
Viewed: 137 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Test patch reinforced for bending
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Setting the patch in the press
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Fetching the first new tubes into the shop
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Swaging set up ready to go
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Test patch reinforced for bending - Nigel Bennett (nbennett)
Viewed: 138 times.
Setting the patch in the press - Nigel Bennett (nbennett)
Viewed: 150 times.
Fetching the first new tubes into the shop - Nigel Bennett (nbennett)
Viewed: 134 times.
Swaging set up ready to go - Nigel Bennett (nbennett)
Viewed: 132 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First 24 new tubes now swaged
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Swaging area now in full use
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
New pipework in place along the boiler
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Set up for cutting ferrules
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
First 24 new tubes now swaged - Nigel Bennett (nbennett)
Viewed: 141 times.
Swaging area now in full use - Nigel Bennett (nbennett)
Viewed: 136 times.
New pipework in place along the boiler - Nigel Bennett (nbennett)
Viewed: 142 times.
Set up for cutting ferrules - Nigel Bennett (nbennett)
Viewed: 123 times.
Powered by Gallery.
Copyright © 1995-2014, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM