The smokebox is now ready for new bolts - Nigel Bennett (nbennett) Viewed: 1437 times.
|
All flexi stays to be tseted are now marked - Nigel Bennett (nbennett) Viewed: 1402 times.
|
Debris collects in the socket of the stay - Nigel Bennett (nbennett) Viewed: 1412 times.
|
So the socket must be cleaned before testing - Nigel Bennett (nbennett) Viewed: 1357 times.
|
| | | |
| | | |
|
|
|
|
Superheater element bolts before - Nigel Bennett (nbennett) Viewed: 1336 times.
|
and after cleaning and checking - Nigel Bennett (nbennett) Viewed: 1388 times.
|
Glenn turns the taper on a safe end - Nigel Bennett (nbennett) Viewed: 1380 times.
|
Ed works on the new lubricator piping - Nigel Bennett (nbennett) Viewed: 1335 times.
|
| | | |
| | | |
|
|
|
|
First two flues now safe ended - Nigel Bennett (nbennett) Viewed: 1323 times.
|
Motion brackets now cleaned for repainting - Nigel Bennett (nbennett) Viewed: 1386 times.
|
Cylinders now well under way - Nigel Bennett (nbennett) Viewed: 1378 times.
|
Boiler insulation stored ready to install - Nigel Bennett (nbennett) Viewed: 1334 times.
|
| | | |
| | | |
|
|
|
|
Test patch reinforced for bending - Nigel Bennett (nbennett) Viewed: 1365 times.
|
Setting the patch in the press - Nigel Bennett (nbennett) Viewed: 1370 times.
|
Fetching the first new tubes into the shop - Nigel Bennett (nbennett) Viewed: 1349 times.
|
Swaging set up ready to go - Nigel Bennett (nbennett) Viewed: 1403 times.
|
| | | |
| | | |
|
|
|
|
First 24 new tubes now swaged - Nigel Bennett (nbennett) Viewed: 1431 times.
|
Swaging area now in full use - Nigel Bennett (nbennett) Viewed: 1330 times.
|
New pipework in place along the boiler - Nigel Bennett (nbennett) Viewed: 1373 times.
|
Set up for cutting ferrules - Nigel Bennett (nbennett) Viewed: 1414 times.
|
| | | |