| | | |
|
|
|
|
|
But lots still to swage - Nigel Bennett (nbennett) Viewed: 41 times.
|
Filling the flues to hydro-test - Nigel Bennett (nbennett) Viewed: 46 times.
|
The other end of the test rig - Nigel Bennett (nbennett) Viewed: 55 times.
|
Eric and Mark swaging - Nigel Bennett (nbennett) Viewed: 41 times.
|
| | | |
| | | |
|
|
|
|
|
Making a swage - Nigel Bennett (nbennett) Viewed: 40 times.
|
Jerry cleans the swaged ends - Nigel Bennett (nbennett) Viewed: 48 times.
|
Nancy and Ed loading tubes - Nigel Bennett (nbennett) Viewed: 47 times.
|
Tube loading gets under way - Nigel Bennett (nbennett) Viewed: 50 times.
|
| | | |
| | | |
|
|
|
|
|
You could pay for this sort of exercise at a gym ! - Nigel Bennett (nbennett) Viewed: 55 times.
|
Collin sets tubes in the fire box - Nigel Bennett (nbennett) Viewed: 49 times.
|
Many tubes are now loaded - Nigel Bennett (nbennett) Viewed: 51 times.
|
Jason "relaxes" between tubes - Nigel Bennett (nbennett) Viewed: 44 times.
|
| | | |
| | | |
|
|
|
|
|
Fireman's side now loaded - Nigel Bennett (nbennett) Viewed: 43 times.
|
Engineer's side showing the ferrules - Nigel Bennett (nbennett) Viewed: 47 times.
|
Loading starts for the day - Nigel Bennett (nbennett) Viewed: 46 times.
|
Tubes are fed into the front tube sheet - Nigel Bennett (nbennett) Viewed: 43 times.
|
| | | |
| | | |
|
|
|
|
|
Matt guides them thru the barrel - Nigel Bennett (nbennett) Viewed: 46 times.
|
Nigel locates the ends in the rear sheet - Nigel Bennett (nbennett) Viewed: 44 times.
|
By end of day just 17 gaps - Nigel Bennett (nbennett) Viewed: 42 times.
|
Little space left in the boiler - Nigel Bennett (nbennett) Viewed: 43 times.
|
| | | |