Misc Track Dept Updates 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Electric Jct Tamped/ Regulated 3-13-10
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Greg Frech and JD Marzec sort track material in Yard 11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Another 100 Tons of ballast to load
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Joel Ahrendt running the X-17 for the first time
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Electric Jct Tamped/ Regulated 3-13-10 - Adam Robillard (lzeje657)
Viewed: 90 times.
Greg Frech and JD Marzec sort track material in Yard 11 - Adam Robillard (lzeje657)
Viewed: 268 times.
Another 100 Tons of ballast to load - Adam Robillard (lzeje657)
Viewed: 145 times.
Joel Ahrendt running the X-17 for the first time - Adam Robillard (lzeje657)
Viewed: 216 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Completed tracks in Barn 11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Tamper working on 11-3 with Ballasting on 11-4
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Tom watches the wheels as we lift the diamond off the ground.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Frank guides the diamond into the air and onto the flatcar
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Completed tracks in Barn 11 - Adam Robillard (lzeje657)
Viewed: 440 times.
Tamper working on 11-3 with Ballasting on 11-4 - Adam Robillard (lzeje657)
Viewed: 426 times.
Tom watches the wheels as we lift the diamond off the ground. - Adam Robillard (lzeje657)
Viewed: 375 times.
Frank guides the diamond into the air and onto the flatcar - Adam Robillard (lzeje657)
Viewed: 385 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Switch timbers stacked near the connector track.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Switch timbers stacked near the connector track. - Adam Robillard (lzeje657)
Viewed: 405 times.
Powered by Gallery.
Return to the Home Page Search this Website Roster of Equipment
Last Modified: 06/12/09 3:56:24 AM
Copyright © 1995-2010, Illinois Railway Museum. All rights reserved.