UP 3786 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.05.09 - THIS PART OF THE CABOOSE HAS THE WALLS COMPLETELY FINISH COATED.  LOOKS ORIGINAL, PRIOR TO USE BY THE TRAINMEN.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.05.09 - WAYNE BATES IS CLEANING PART OF THE COAL STOVE.  IT IS A VERY DIRTY JOB!
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.05.09 - DAVE "SHAGGY" BATES HAS CLEANED AND PRIMED THE LEFT SIDE TRUCKS AND THE AB VALVE. HERE IS IS PRIMING THE AB VALVE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.12.09 - THE FIRST OF THE FLOOR AREAS WAS PRIMED TODAY.  THE CAR INTERIOR PAINTING, EXCEPT FOR THE FLOOR IS NOW COMPLETE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
08.05.09 - THIS PART OF THE CABOOSE HAS THE WALLS COMPLETELY FINISH COATED. LOOKS ORIGINAL, PRIOR TO USE BY THE TRAINMEN. - Kirk L. Warner (kwarner)
Viewed: 2536 times.
08.05.09 - WAYNE BATES IS CLEANING PART OF THE COAL STOVE. IT IS A VERY DIRTY JOB! - Kirk L. Warner (kwarner)
Viewed: 2547 times.
08.05.09 - DAVE "SHAGGY" BATES HAS CLEANED AND PRIMED THE LEFT SIDE TRUCKS AND THE AB VALVE. HERE IS IS PRIMING THE AB VALVE. - Kirk L. Warner (kwarner)
Viewed: 2584 times.
08.12.09 - THE FIRST OF THE FLOOR AREAS WAS PRIMED TODAY. THE CAR INTERIOR PAINTING, EXCEPT FOR THE FLOOR IS NOW COMPLETE. - Kirk L. Warner (kwarner)
Viewed: 1335 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.12.09 - "DOC" PAINTED ALL OF THE TRUCKS WITH THE FINISH COLOR TODAY.  IT WAS A DIFFICULT, MESSY JOB.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.12.09 - KIRK WARNER DISCOVERED A CRACK, CIRCLED IN WHITE, IN THE COUPLER.  THE COUPLER WILL HAVE TO BE REPLACED PRIOR TO THE CAR ENTERING SERVICE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.12.09 - BILL LEIDER IS PAINTING THE GRATING ON THE STEPS OF THE CABOOSE.  IT IS A SLOW, MESSY JOB TO COMPLETE, AS IT IS HARD TO COVER EACH PART OF THE GRATING WITHOUT DRIPPING.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.19.09 - THE INTERIOR FLOOR HAS NOW BEEN SANDED AND MUCH OF IT HAS BEEN PRIMED.  BEYOND THE TAPE, BOB PAYNE IS PAINTING THE FLOOR WITH FINISH PAINT, AS EVIDENCED BY THE GLOSS.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
08.12.09 - "DOC" PAINTED ALL OF THE TRUCKS WITH THE FINISH COLOR TODAY. IT WAS A DIFFICULT, MESSY JOB. - Kirk L. Warner (kwarner)
Viewed: 1367 times.
08.12.09 - KIRK WARNER DISCOVERED A CRACK, CIRCLED IN WHITE, IN THE COUPLER. THE COUPLER WILL HAVE TO BE REPLACED PRIOR TO THE CAR ENTERING SERVICE. - Kirk L. Warner (kwarner)
Viewed: 2614 times.
08.12.09 - BILL LEIDER IS PAINTING THE GRATING ON THE STEPS OF THE CABOOSE. IT IS A SLOW, MESSY JOB TO COMPLETE, AS IT IS HARD TO COVER EACH PART OF THE GRATING WITHOUT DRIPPING. - Kirk L. Warner (kwarner)
Viewed: 2686 times.
08.19.09 - THE INTERIOR FLOOR HAS NOW BEEN SANDED AND MUCH OF IT HAS BEEN PRIMED. BEYOND THE TAPE, BOB PAYNE IS PAINTING THE FLOOR WITH FINISH PAINT, AS EVIDENCED BY THE GLOSS. - Kirk L. Warner (kwarner)
Viewed: 2659 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
08.19.09 - WAYNE BATES IS PAINTING THE SECTIONS OF THE COAL STOVE PRIOR TO INSTALLATION.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.09 - PAINTING OF THE GRATING ON THE STEPS IS UNDERWAY.  IT IS VERY TIME CONSUMING AND MESSY.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.09 - THE PAINTING OF THE INTERIOR IS COMPLETE, INCLUDING THE FLOOR WHICH SHINES IN THE PHOTO.  ONLY SOME TOUCH UP REAMINS TO BE COMPLETED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.23.09 - THE INTERIOR IS COMPLETE, EXCEPT FOR THE SINK.  HERE THE STOVE, HEAT SHIELD AND COAL SHUTTLE ARE IN PLACE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
08.19.09 - WAYNE BATES IS PAINTING THE SECTIONS OF THE COAL STOVE PRIOR TO INSTALLATION. - Kirk L. Warner (kwarner)
Viewed: 2636 times.
09.02.09 - PAINTING OF THE GRATING ON THE STEPS IS UNDERWAY. IT IS VERY TIME CONSUMING AND MESSY. - Kirk L. Warner (kwarner)
Viewed: 2654 times.
09.02.09 - THE PAINTING OF THE INTERIOR IS COMPLETE, INCLUDING THE FLOOR WHICH SHINES IN THE PHOTO. ONLY SOME TOUCH UP REAMINS TO BE COMPLETED. - Kirk L. Warner (kwarner)
Viewed: 2634 times.
09.23.09 - THE INTERIOR IS COMPLETE, EXCEPT FOR THE SINK. HERE THE STOVE, HEAT SHIELD AND COAL SHUTTLE ARE IN PLACE. - Kirk L. Warner (kwarner)
Viewed: 1483 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
10.21.09 - PHOTOS OF THE FINISHED INTERIOR.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
10.21.09 FLARE AND FUSEE BOX
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
10.21.09 - INSTRUCTIONS ON HOW TO HANDLE A HOTBOX.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
10.21.09 - THE CONDUCTOR'S BRAKE CONTROL AND INSTRUCTIONS.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
10.21.09 - PHOTOS OF THE FINISHED INTERIOR. - Kirk L. Warner (kwarner)
Viewed: 2928 times.
10.21.09 FLARE AND FUSEE BOX - Kirk L. Warner (kwarner)
Viewed: 2930 times.
10.21.09 - INSTRUCTIONS ON HOW TO HANDLE A HOTBOX. - Kirk L. Warner (kwarner)
Viewed: 3021 times.
10.21.09 - THE CONDUCTOR'S BRAKE CONTROL AND INSTRUCTIONS. - Kirk L. Warner (kwarner)
Viewed: 2954 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
10.21.09 - MORE OF THE INTERIOR WITH THE KEROSENE LAMPS IN PLACE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
10.21.09 - MORE OF THE INTERIOR WITH THE KEROSENE LAMPS IN PLACE. - Kirk L. Warner (kwarner)
Viewed: 1820 times.
Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM