Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Tamper Eng. Installed 04-21-08 
Rebuilt tamper engined reinstalled Fuel lines hooked back up and engine all bolted down Ready for service Warren L, guides the engine off the pallet and back onto the tamper
Rebuilt tamper engined reinstalled - Pete Pedersen (pedersen40)
Viewed: 828 times.
Fuel lines hooked back up and engine all bolted down - Pete Pedersen (pedersen40)
Viewed: 630 times.
Ready for service - Pete Pedersen (pedersen40)
Viewed: 666 times.
Warren L, guides the engine off the pallet and back onto the tamper - Pete Pedersen (pedersen40)
Viewed: 746 times.
DSC02722.JPGTamper prior to engine installment DSC02719.JPGRebuilt tamper engine ready to be reinstalled
DSC02722.JPG - Pete Pedersen (pedersen40)
Viewed: 643 times.
Tamper prior to engine installment - Pete Pedersen (pedersen40)
Viewed: 560 times.
DSC02719.JPG - Pete Pedersen (pedersen40)
Viewed: 616 times.
Rebuilt tamper engine ready to be reinstalled - Pete Pedersen (pedersen40)
Viewed: 801 times.
All the belts are back on and some of the new hoses are visible
All the belts are back on and some of the new hoses are visible - Pete Pedersen (pedersen40)
Viewed: 712 times.
Powered by Gallery.
Copyright © 1995-2017, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM