Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Tamper Eng. Installed 04-21-08 
Rebuilt tamper engined reinstalled Fuel lines hooked back up and engine all bolted down Ready for service Warren L, guides the engine off the pallet and back onto the tamper
Rebuilt tamper engined reinstalled - Pete Pedersen (pedersen40)
Viewed: 768 times.
Fuel lines hooked back up and engine all bolted down - Pete Pedersen (pedersen40)
Viewed: 579 times.
Ready for service - Pete Pedersen (pedersen40)
Viewed: 615 times.
Warren L, guides the engine off the pallet and back onto the tamper - Pete Pedersen (pedersen40)
Viewed: 695 times.
DSC02722.JPGTamper prior to engine installment DSC02719.JPGRebuilt tamper engine ready to be reinstalled
DSC02722.JPG - Pete Pedersen (pedersen40)
Viewed: 584 times.
Tamper prior to engine installment - Pete Pedersen (pedersen40)
Viewed: 512 times.
DSC02719.JPG - Pete Pedersen (pedersen40)
Viewed: 569 times.
Rebuilt tamper engine ready to be reinstalled - Pete Pedersen (pedersen40)
Viewed: 741 times.
All the belts are back on and some of the new hoses are visible
All the belts are back on and some of the new hoses are visible - Pete Pedersen (pedersen40)
Viewed: 648 times.
Powered by Gallery.
Copyright © 1995-2016, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM