Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Tamper Eng. Installed 04-21-08 
Rebuilt tamper engined reinstalled Fuel lines hooked back up and engine all bolted down Ready for service Warren L, guides the engine off the pallet and back onto the tamper
Rebuilt tamper engined reinstalled - Pete Pedersen (pedersen40)
Viewed: 636 times.
Fuel lines hooked back up and engine all bolted down - Pete Pedersen (pedersen40)
Viewed: 476 times.
Ready for service - Pete Pedersen (pedersen40)
Viewed: 484 times.
Warren L, guides the engine off the pallet and back onto the tamper - Pete Pedersen (pedersen40)
Viewed: 569 times.
DSC02722.JPGTamper prior to engine installment DSC02719.JPGRebuilt tamper engine ready to be reinstalled
DSC02722.JPG - Pete Pedersen (pedersen40)
Viewed: 450 times.
Tamper prior to engine installment - Pete Pedersen (pedersen40)
Viewed: 403 times.
DSC02719.JPG - Pete Pedersen (pedersen40)
Viewed: 460 times.
Rebuilt tamper engine ready to be reinstalled - Pete Pedersen (pedersen40)
Viewed: 596 times.
All the belts are back on and some of the new hoses are visible
All the belts are back on and some of the new hoses are visible - Pete Pedersen (pedersen40)
Viewed: 543 times.
Powered by Gallery.
Copyright © 1995-2014, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM