Trackwork April 16, 2008  

transpixel
transpixel The track is raised, final job is replace 2 ties under a joint transpixel
transpixel

The track is raised, final job is replace 2 ties under a joint - Adam Robillard (lzeje657)


Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM