Removing Old 111 Track for Barn 11 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Steam Dept Crane lifting track panels out of 11-1 track
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Track removed
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
New stub track outside of the Barn
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
IRM Mem.DayWeekend2008 009
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Steam Dept Crane lifting track panels out of 11-1 track - Adam Robillard (lzeje657)
Viewed: 1737 times.
Track removed - Adam Robillard (lzeje657)
Viewed: 1718 times.
New stub track outside of the Barn - Adam Robillard (lzeje657)
Viewed: 1704 times.
IRM Mem.DayWeekend2008 009 - Adam Robillard (lzeje657)
Viewed: 1686 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Warren L, Jamie K and Nathan hook up the next track panel to be removed
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Sharp lookin' paint job on the Steam Dept Brownhoist
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The Steam Dept's locomotive crane doing exactly what it's designed for
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Track panel in the air getting ready to stack on top of the other ones
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Warren L, Jamie K and Nathan hook up the next track panel to be removed - Adam Robillard (lzeje657)
Viewed: 1678 times.
Sharp lookin' paint job on the Steam Dept Brownhoist - Adam Robillard (lzeje657)
Viewed: 1647 times.
The Steam Dept's locomotive crane doing exactly what it's designed for - Adam Robillard (lzeje657)
Viewed: 1675 times.
Track panel in the air getting ready to stack on top of the other ones - Adam Robillard (lzeje657)
Viewed: 1664 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Heading east with another panel
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Track on the far left is being removed and will be built on the new grade to the far right
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The new grade for the future 11-4 track.  The barn will be built before the track is built
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Yard 11 looking East at the new grade for 11-4 track
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Heading east with another panel - Adam Robillard (lzeje657)
Viewed: 1576 times.
Track on the far left is being removed and will be built on the new grade to the far right - Adam Robillard (lzeje657)
Viewed: 1640 times.
The new grade for the future 11-4 track. The barn will be built before the track is built - Adam Robillard (lzeje657)
Viewed: 1632 times.
Yard 11 looking East at the new grade for 11-4 track - Adam Robillard (lzeje657)
Viewed: 1647 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Yard 11 before the Barn and just starting the track rebuild
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The old 11-1 track was stacked in neat piles at the East end of the yard to be reinstalled as the new 11-4 later on
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Jeff as the operator trainee did a fine job running the crane
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Jamie getting the hook ready for the next lift
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Yard 11 before the Barn and just starting the track rebuild - Adam Robillard (lzeje657)
Viewed: 1660 times.
The old 11-1 track was stacked in neat piles at the East end of the yard to be reinstalled as the new 11-4 later on - Adam Robillard (lzeje657)
Viewed: 1619 times.
Jeff as the operator trainee did a fine job running the crane - Adam Robillard (lzeje657)
Viewed: 1619 times.
Jamie getting the hook ready for the next lift - Adam Robillard (lzeje657)
Viewed: 1521 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
IRM Mem.DayWeekend2008 051
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Stacking track panels at Yard 11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Operator and operator trainee from the Steam Shop
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Warren, Nathan and Jamie get the track panels neatly stacked
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
IRM Mem.DayWeekend2008 051 - Adam Robillard (lzeje657)
Viewed: 1606 times.
Stacking track panels at Yard 11 - Adam Robillard (lzeje657)
Viewed: 1604 times.
Operator and operator trainee from the Steam Shop - Adam Robillard (lzeje657)
Viewed: 1611 times.
Warren, Nathan and Jamie get the track panels neatly stacked - Adam Robillard (lzeje657)
Viewed: 1619 times.
Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM