Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Yard 4 West I-Joint 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
IJ's on the running and guard rails.  A first for IRM.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
making sure the saw had all the UMPH it needed.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Working the saw...
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Lining up to drill holes....
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
IJ's on the running and guard rails. A first for IRM. - Adam Robillard (lzeje657)
Viewed: 987 times.
making sure the saw had all the UMPH it needed. - Adam Robillard (lzeje657)
Viewed: 1037 times.
Working the saw... - Adam Robillard (lzeje657)
Viewed: 1003 times.
Lining up to drill holes.... - Adam Robillard (lzeje657)
Viewed: 1001 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Adam and Jamie working on the new IJ's for signals
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Adam and Jamie working on the new IJ's for signals - Adam Robillard (lzeje657)
Viewed: 1073 times.
Powered by Gallery.
Copyright © 1995-2015, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM