Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Yard 4 West I-Joint 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
IJ's on the running and guard rails.  A first for IRM.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
making sure the saw had all the UMPH it needed.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Working the saw...
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Lining up to drill holes....
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
IJ's on the running and guard rails. A first for IRM. - Adam Robillard (lzeje657)
Viewed: 720 times.
making sure the saw had all the UMPH it needed. - Adam Robillard (lzeje657)
Viewed: 790 times.
Working the saw... - Adam Robillard (lzeje657)
Viewed: 752 times.
Lining up to drill holes.... - Adam Robillard (lzeje657)
Viewed: 751 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Adam and Jamie working on the new IJ's for signals
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Adam and Jamie working on the new IJ's for signals - Adam Robillard (lzeje657)
Viewed: 822 times.
Powered by Gallery.
Copyright © 1995-2012, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM