Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Barn 3 Project 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Adam running the 6000
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0180
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0176
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Gun tamping the low spots in the barn.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Adam running the 6000 - Frank Devries (icemancne)
Viewed: 93 times.
DSC 0180 - Frank Devries (icemancne)
Viewed: 90 times.
DSC 0176 - Frank Devries (icemancne)
Viewed: 86 times.
Gun tamping the low spots in the barn. - Frank Devries (icemancne)
Viewed: 78 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Phil running the compressor into the barn for spot tamping.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Dave gets some training on the tie crane.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Dave and Evan inspect the work
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
After lifting comes gun tamping, as the inspector checks the work
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Phil running the compressor into the barn for spot tamping. - Frank Devries (icemancne)
Viewed: 91 times.
Dave gets some training on the tie crane. - Frank Devries (icemancne)
Viewed: 76 times.
Dave and Evan inspect the work - Frank Devries (icemancne)
Viewed: 108 times.
After lifting comes gun tamping, as the inspector checks the work - Frank Devries (icemancne)
Viewed: 80 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Jack leveling the 31/32 switch. It was all jacked up!
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Dead Switch Timbers from the Yard 3 switch
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Tamper crew continues to troubleshoot....
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0142
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Jack leveling the 31/32 switch. It was all jacked up! - Frank Devries (icemancne)
Viewed: 97 times.
Dead Switch Timbers from the Yard 3 switch - Frank Devries (icemancne)
Viewed: 80 times.
Tamper crew continues to troubleshoot.... - Frank Devries (icemancne)
Viewed: 81 times.
DSC 0142 - Frank Devries (icemancne)
Viewed: 79 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0139
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0130
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0126
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First day of panel install -  Half way done.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
DSC 0139 - Frank Devries (icemancne)
Viewed: 89 times.
DSC 0130 - Frank Devries (icemancne)
Viewed: 89 times.
DSC 0126 - Frank Devries (icemancne)
Viewed: 84 times.
First day of panel install - Half way done. - Frank Devries (icemancne)
Viewed: 90 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First stack of panels are now in the barn.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First panel in on track 31.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mark and Tim bolt up the temp comp joint to tie the first new panel of track into track 31.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Gauge issues required jacks to get the first joints put together. Mark doing the honors.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
First stack of panels are now in the barn. - Frank Devries (icemancne)
Viewed: 98 times.
First panel in on track 31. - Frank Devries (icemancne)
Viewed: 99 times.
Mark and Tim bolt up the temp comp joint to tie the first new panel of track into track 31. - Frank Devries (icemancne)
Viewed: 88 times.
Gauge issues required jacks to get the first joints put together. Mark doing the honors. - Frank Devries (icemancne)
Viewed: 89 times.
Powered by Gallery.