Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Barn 3 Project 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Adam running the 6000
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0180
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0176
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Gun tamping the low spots in the barn.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Adam running the 6000 - Frank Devries (icemancne)
Viewed: 166 times.
DSC 0180 - Frank Devries (icemancne)
Viewed: 166 times.
DSC 0176 - Frank Devries (icemancne)
Viewed: 152 times.
Gun tamping the low spots in the barn. - Frank Devries (icemancne)
Viewed: 136 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Phil running the compressor into the barn for spot tamping.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Dave gets some training on the tie crane.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Dave and Evan inspect the work
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
After lifting comes gun tamping, as the inspector checks the work
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Phil running the compressor into the barn for spot tamping. - Frank Devries (icemancne)
Viewed: 160 times.
Dave gets some training on the tie crane. - Frank Devries (icemancne)
Viewed: 145 times.
Dave and Evan inspect the work - Frank Devries (icemancne)
Viewed: 182 times.
After lifting comes gun tamping, as the inspector checks the work - Frank Devries (icemancne)
Viewed: 144 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Jack leveling the 31/32 switch. It was all jacked up!
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Dead Switch Timbers from the Yard 3 switch
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Tamper crew continues to troubleshoot....
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0142
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Jack leveling the 31/32 switch. It was all jacked up! - Frank Devries (icemancne)
Viewed: 175 times.
Dead Switch Timbers from the Yard 3 switch - Frank Devries (icemancne)
Viewed: 141 times.
Tamper crew continues to troubleshoot.... - Frank Devries (icemancne)
Viewed: 145 times.
DSC 0142 - Frank Devries (icemancne)
Viewed: 146 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0139
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0130
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC 0126
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First day of panel install -  Half way done.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
DSC 0139 - Frank Devries (icemancne)
Viewed: 160 times.
DSC 0130 - Frank Devries (icemancne)
Viewed: 153 times.
DSC 0126 - Frank Devries (icemancne)
Viewed: 144 times.
First day of panel install - Half way done. - Frank Devries (icemancne)
Viewed: 151 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First stack of panels are now in the barn.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First panel in on track 31.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mark and Tim bolt up the temp comp joint to tie the first new panel of track into track 31.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Gauge issues required jacks to get the first joints put together. Mark doing the honors.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
First stack of panels are now in the barn. - Frank Devries (icemancne)
Viewed: 157 times.
First panel in on track 31. - Frank Devries (icemancne)
Viewed: 167 times.
Mark and Tim bolt up the temp comp joint to tie the first new panel of track into track 31. - Frank Devries (icemancne)
Viewed: 143 times.
Gauge issues required jacks to get the first joints put together. Mark doing the honors. - Frank Devries (icemancne)
Viewed: 162 times.
Powered by Gallery.
Copyright © 1995-2014, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM