Mainline Culvert Work on 9-1-2007  

FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Finally deep enough to see that the two sections of culvert were never properly fitted when installed back in the early 80's.  You can also see where the breach was allowing the earth above to wash away into the culvert.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME

Finally deep enough to see that the two sections of culvert were never properly fitted when installed back in the early 80's. You can also see where the breach was allowing the earth above to wash away into the culvert. - James Kolanowski (jamesk)


Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM