Mainline Culvert Work on 9-1-2007  

FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
At the smaller culverts near MP 1.7, Dave gets ready to backfill after we removed and reset one of those sections that had separated.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME

At the smaller culverts near MP 1.7, Dave gets ready to backfill after we removed and reset one of those sections that had separated. - James Kolanowski (jamesk)


Powered by Gallery v1.4.4-pl6
Return to the Home Page Search this Website Roster of Equipment
Last Modified: 07/25/05 4:33:19 PM
Copyright © 1995-2008, Illinois Railway Museum. All rights reserved.