December 28 and 29, 2008 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
8537 and L7 moved into the shop for a couple weeks.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Steel ready to be cut for the back cab wall of 8537.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
A random photo down the north isle.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
8537 and L7 moved into the shop for a couple weeks. - James Kolanowski (jamesk)
Viewed: 1757 times.
Steel ready to be cut for the back cab wall of 8537. - James Kolanowski (jamesk)
Viewed: 1643 times.
A random photo down the north isle. - James Kolanowski (jamesk)
Viewed: 1698 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Gauge cluster is all painted.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Insulation installed around the back cab wall.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Panels and batten strips installed.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Gauge cluster is all painted. - James Kolanowski (jamesk)
Viewed: 1738 times.
Insulation installed around the back cab wall. - James Kolanowski (jamesk)
Viewed: 1662 times.
Panels and batten strips installed. - James Kolanowski (jamesk)
Viewed: 1668 times.
Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM