Photo Properties

09.02.07 - THE LETTERING ABOVE THE BL STEPS HAS BEEN APPLIED. THE OVERFLOW PIPE FROM THE HEATER FUEL TANK HAS ALSO BEEN APPLIED.
09.02.07 - THE LETTERING ABOVE THE BL STEPS HAS BEEN APPLIED. THE OVERFLOW PIPE FROM THE HEATER FUEL TANK HAS ALSO BEEN APPLIED. - Kirk L. Warner (kwarner)