Photo Properties

06.03.07 - KIRK WARNER HAS INSTALLED THE FIRST THREE INTERIOR PANELS ON THE LEFT SIDE (SOUTH) OF THE THE INTERIOR. THEY HAVE HAD A COAT OF FINISH PAINT.
06.03.07 - KIRK WARNER HAS INSTALLED THE FIRST THREE INTERIOR PANELS ON THE LEFT SIDE (SOUTH) OF THE THE INTERIOR. THEY HAVE HAD A COAT OF FINISH PAINT. - Kirk L. Warner (kwarner)