CRIP 19135 TRANSFER CABOOSE  

transpixel
transpixel 12.16.07 - 13 DEGREES WITH SIX INCHES OF SNOW.  WORK CONTINUES IN SPITE OF THE WEATHER.  KIRK WARNER IS DRILLING PILOT HOLES TO COMPLETE THE INSTALLATION OF THE TIMBER BOLTS SECURING THE DECKING TO THE CENTERSILL ON THE B END OF THE CAR. transpixel
transpixel

12.16.07 - 13 DEGREES WITH SIX INCHES OF SNOW. WORK CONTINUES IN SPITE OF THE WEATHER. KIRK WARNER IS DRILLING PILOT HOLES TO COMPLETE THE INSTALLATION OF THE TIMBER BOLTS SECURING THE DECKING TO THE CENTERSILL ON THE B END OF THE CAR. - Kirk L. Warner (kwarner)


Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM