Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Wheel Drop 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The mechanisim is rolled out in the open to install the beams for which the table rides on
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Nick Kallas aids the department in installing these beams
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Volunteer Stu tightens the bolts on the top bearing of the table after the installation of the support beams
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The Bay City crane was used to put the table  and mechanisim in place durring the summer of '07
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
The mechanisim is rolled out in the open to install the beams for which the table rides on - Matthew Dowd (SteamDepartment)
Viewed: 1455 times.
Nick Kallas aids the department in installing these beams - Matthew Dowd (SteamDepartment)
Viewed: 1409 times.
Volunteer Stu tightens the bolts on the top bearing of the table after the installation of the support beams - Matthew Dowd (SteamDepartment)
Viewed: 1329 times.
The Bay City crane was used to put the table and mechanisim in place durring the summer of '07 - Matthew Dowd (SteamDepartment)
Viewed: 1370 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shop volunteers asist in guiding the table in place
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The 200' of track beyond the shop was all laid by steam department members
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Steam Team members weld support brackets on the ladder for the drop pit
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Drop table mechanisim is moved into place for installation (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Shop volunteers asist in guiding the table in place - Matthew Dowd (SteamDepartment)
Viewed: 1287 times.
The 200' of track beyond the shop was all laid by steam department members - Matthew Dowd (SteamDepartment)
Viewed: 1331 times.
Steam Team members weld support brackets on the ladder for the drop pit - Matthew Dowd (SteamDepartment)
Viewed: 1319 times.
Drop table mechanisim is moved into place for installation (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1342 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Rigging of the table is complete, and the table is finally airborne. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Positioning the mechanisim over the pit for the install. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Positined over the pit, the mechanisim is ready to be put in. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Lowering begins as volunteers guide it in place. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Rigging of the table is complete, and the table is finally airborne. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1310 times.
Positioning the mechanisim over the pit for the install. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1302 times.
Positined over the pit, the mechanisim is ready to be put in. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1249 times.
Lowering begins as volunteers guide it in place. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1332 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Final alignment and positioning. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The mechanisim in moved out of the way in order to make the installation of the table easier. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Rigging the table for lifting. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Positioned over the pit, the table is steadied for lowering. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Final alignment and positioning. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1302 times.
The mechanisim in moved out of the way in order to make the installation of the table easier. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1248 times.
Rigging the table for lifting. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1271 times.
Positioned over the pit, the table is steadied for lowering. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1230 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Our resident crane operator watches the load as it is lowered into the pit. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Guiding the table into place. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The table is in place and the installation is sucessful. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The complete table and mechanisim sits in the pit for the first time. (Stuart B. Brosh photo)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Our resident crane operator watches the load as it is lowered into the pit. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1238 times.
Guiding the table into place. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1247 times.
The table is in place and the installation is sucessful. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1335 times.
The complete table and mechanisim sits in the pit for the first time. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment)
Viewed: 1607 times.
Powered by Gallery.
Copyright © 1995-2015, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM