Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 2011 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Spring 2011 Inspections
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Patrick on the forklift loading new mainline ties onto the flatcar 3-12-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
First full load of new ties on the flatcar ready to be distributed along the mainline. 3-12-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Work train with caboose and new ties heads out to drop off the bundles 3-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Album: Spring 2011 Inspections
Changed: 02/27/12
Contains: 7 items.
Viewed: 2246 times.
Patrick on the forklift loading new mainline ties onto the flatcar 3-12-11 - Adam Robillard (lzeje657)
Viewed: 1147 times.
First full load of new ties on the flatcar ready to be distributed along the mainline. 3-12-11 - Adam Robillard (lzeje657)
Viewed: 1119 times.
Work train with caboose and new ties heads out to drop off the bundles 3-13-11 - Adam Robillard (lzeje657)
Viewed: 1215 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Unloading bundles of 20 & 25 along the mainline. 3-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Bundles were set out every couple hundred feet or so. Jeron on the car and Patrick on the ground hooking and unhooking the bundles. 3-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Jeron Glander and Patrick Shea prepare to cut off the crane to pull a bundle of ties off the flatcar.  Tom Hunter is running the crane. 3-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Swinging bundles of new ties along the mainline. 3-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Unloading bundles of 20 & 25 along the mainline. 3-13-11 - Adam Robillard (lzeje657)
Viewed: 1095 times.
Bundles were set out every couple hundred feet or so. Jeron on the car and Patrick on the ground hooking and unhooking the bundles. 3-13-11 - Adam Robillard (lzeje657)
Viewed: 1082 times.
Jeron Glander and Patrick Shea prepare to cut off the crane to pull a bundle of ties off the flatcar. Tom Hunter is running the crane. 3-13-11 - Adam Robillard (lzeje657)
Viewed: 1152 times.
Swinging bundles of new ties along the mainline. 3-13-11 - Adam Robillard (lzeje657)
Viewed: 1064 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Finishing off the last of the ties. The next step is to use the tie crane and set each tie out where it'll be installed. 3-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
New tie bundles laid out on the mainline East of Seeman Road 3-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Tom distributing ties at Johnson Siding 4-16-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Putting together the work train 5-14-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Finishing off the last of the ties. The next step is to use the tie crane and set each tie out where it'll be installed. 3-13-11 - Adam Robillard (lzeje657)
Viewed: 1063 times.
New tie bundles laid out on the mainline East of Seeman Road 3-13-11 - Adam Robillard (lzeje657)
Viewed: 1083 times.
Tom distributing ties at Johnson Siding 4-16-11 - Adam Robillard (lzeje657)
Viewed: 1074 times.
Putting together the work train 5-14-11 - Adam Robillard (lzeje657)
Viewed: 1174 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Work train at East Switch 5-14-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Work train on the mainline 5-14-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Work train picking up scrap metal 5-14-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Cleaning up old ties for disposal 5-14-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Work train at East Switch 5-14-11 - Adam Robillard (lzeje657)
Viewed: 1100 times.
Work train on the mainline 5-14-11 - Adam Robillard (lzeje657)
Viewed: 1077 times.
Work train picking up scrap metal 5-14-11 - Adam Robillard (lzeje657)
Viewed: 1111 times.
Cleaning up old ties for disposal 5-14-11 - Adam Robillard (lzeje657)
Viewed: 1107 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Used tie pile 5-14-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Rebuilding Ingersoll Rand hand tampers 5-15-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
A train approaching Spaulding Tower late one evening. 4-13-11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Used tie pile 5-14-11 - Adam Robillard (lzeje657)
Viewed: 1163 times.
Rebuilding Ingersoll Rand hand tampers 5-15-11 - Adam Robillard (lzeje657)
Viewed: 1145 times.
A train approaching Spaulding Tower late one evening. 4-13-11 - Adam Robillard (lzeje657)
Viewed: 1288 times.
Powered by Gallery.
Copyright © 1995-2017, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM