Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 CB&Q 504 Restoration, 2009 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shutters are ready for paint.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Radiator intake screens get prepped for paint.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
More small parts get some self-etching primer.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05037.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Shutters are ready for paint. - James Kolanowski (jamesk)
Viewed: 1899 times.
Radiator intake screens get prepped for paint. - James Kolanowski (jamesk)
Viewed: 1508 times.
More small parts get some self-etching primer. - James Kolanowski (jamesk)
Viewed: 1457 times.
DSC05037.JPG - Pete Pedersen (pedersen40)
Viewed: 1072 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05038.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05039.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05040.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05041.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
DSC05038.JPG - Pete Pedersen (pedersen40)
Viewed: 1039 times.
DSC05039.JPG - Pete Pedersen (pedersen40)
Viewed: 1039 times.
DSC05040.JPG - Pete Pedersen (pedersen40)
Viewed: 1040 times.
DSC05041.JPG - Pete Pedersen (pedersen40)
Viewed: 1029 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05042.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05043.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05044.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The Front nose hatch with primer, ready for paint.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
DSC05042.JPG - Pete Pedersen (pedersen40)
Viewed: 1035 times.
DSC05043.JPG - Pete Pedersen (pedersen40)
Viewed: 1016 times.
DSC05044.JPG - Pete Pedersen (pedersen40)
Viewed: 1073 times.
The Front nose hatch with primer, ready for paint. - James Kolanowski (jamesk)
Viewed: 2014 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Firemans side ready for shutters to be bolted back on.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Engineers side screens get their second coat of paint on the inside.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Engineers side shutters get the second coat of paint on one side.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Front nose hatch has had its inside primed and painted.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Firemans side ready for shutters to be bolted back on. - James Kolanowski (jamesk)
Viewed: 1221 times.
Engineers side screens get their second coat of paint on the inside. - James Kolanowski (jamesk)
Viewed: 1193 times.
Engineers side shutters get the second coat of paint on one side. - James Kolanowski (jamesk)
Viewed: 1232 times.
Front nose hatch has had its inside primed and painted. - James Kolanowski (jamesk)
Viewed: 2009 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Front nose ready to have the hatch bolted back on.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Firemans side ready to have the shutters and screens installed.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Firemans side shutters and screens are ready to be bolted back on.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Final coat of gray on the underside of the nose hatch.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Front nose ready to have the hatch bolted back on. - James Kolanowski (jamesk)
Viewed: 1474 times.
Firemans side ready to have the shutters and screens installed. - James Kolanowski (jamesk)
Viewed: 1300 times.
Firemans side shutters and screens are ready to be bolted back on. - James Kolanowski (jamesk)
Viewed: 2139 times.
Final coat of gray on the underside of the nose hatch. - James Kolanowski (jamesk)
Viewed: 2180 times.
Powered by Gallery.
Copyright © 1995-2016, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM