Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 CB&Q 504 Restoration, 2009 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shutters are ready for paint.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Radiator intake screens get prepped for paint.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
More small parts get some self-etching primer.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05037.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Shutters are ready for paint. - James Kolanowski (jamesk)
Viewed: 1531 times.
Radiator intake screens get prepped for paint. - James Kolanowski (jamesk)
Viewed: 1223 times.
More small parts get some self-etching primer. - James Kolanowski (jamesk)
Viewed: 1187 times.
DSC05037.JPG - Pete Pedersen (pedersen40)
Viewed: 800 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05038.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05039.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05040.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05041.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
DSC05038.JPG - Pete Pedersen (pedersen40)
Viewed: 777 times.
DSC05039.JPG - Pete Pedersen (pedersen40)
Viewed: 775 times.
DSC05040.JPG - Pete Pedersen (pedersen40)
Viewed: 781 times.
DSC05041.JPG - Pete Pedersen (pedersen40)
Viewed: 760 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05042.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05043.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
DSC05044.JPG
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The Front nose hatch with primer, ready for paint.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
DSC05042.JPG - Pete Pedersen (pedersen40)
Viewed: 776 times.
DSC05043.JPG - Pete Pedersen (pedersen40)
Viewed: 764 times.
DSC05044.JPG - Pete Pedersen (pedersen40)
Viewed: 799 times.
The Front nose hatch with primer, ready for paint. - James Kolanowski (jamesk)
Viewed: 1521 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Firemans side ready for shutters to be bolted back on.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Engineers side screens get their second coat of paint on the inside.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Engineers side shutters get the second coat of paint on one side.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Front nose hatch has had its inside primed and painted.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Firemans side ready for shutters to be bolted back on. - James Kolanowski (jamesk)
Viewed: 983 times.
Engineers side screens get their second coat of paint on the inside. - James Kolanowski (jamesk)
Viewed: 954 times.
Engineers side shutters get the second coat of paint on one side. - James Kolanowski (jamesk)
Viewed: 965 times.
Front nose hatch has had its inside primed and painted. - James Kolanowski (jamesk)
Viewed: 1539 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Front nose ready to have the hatch bolted back on.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Firemans side ready to have the shutters and screens installed.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Firemans side shutters and screens are ready to be bolted back on.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Final coat of gray on the underside of the nose hatch.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Front nose ready to have the hatch bolted back on. - James Kolanowski (jamesk)
Viewed: 1197 times.
Firemans side ready to have the shutters and screens installed. - James Kolanowski (jamesk)
Viewed: 1020 times.
Firemans side shutters and screens are ready to be bolted back on. - James Kolanowski (jamesk)
Viewed: 1650 times.
Final coat of gray on the underside of the nose hatch. - James Kolanowski (jamesk)
Viewed: 1680 times.
Powered by Gallery.
Copyright © 1995-2014, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM