Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Max Tyms 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: other projects
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Repairing storm damage summer 2014
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Line extension to get power to barns 12, 13, 14, 15 and whatever else gets built on the South property
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Storm damage November 17, 2013
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Album: other projects

A place to plug in Christmas tree lights.
Changed: 08/22/14
Contains: 4 items.
Viewed: 86 times.
Album: Repairing storm damage summer 2014

The transformer feeding signal 202 was hit by lightning and failed. Max Tyms, Bob Olson and Mike Alterio (not pictured) went out to the middle of the railroad and replaced the damaged unit. This is an example of an interdepartmental cooperation- A/C,D/C line and signal Depts. working together.
Changed: 08/21/14
Contains: 5 items.
Viewed: 64 times.
Album: Storm damage November 17, 2013
Changed: 12/27/13
Contains: 27 items.
Viewed: 372 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Winter 2012-13 projects
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: West Loop Project
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Wiring Barn 11
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Pole changeouts 2012
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Album: Winter 2012-13 projects
Changed: 03/03/13
Contains: 14 items.
Viewed: 481 times.
Album: West Loop Project

Photos of the West Loop Trolley Bus Project from preparing steel poles for installation, the first test bus, installing curved segments, Second test bus. Coming soon- installing carline crossing and 15 degree switch.
Changed: 09/01/14
Contains: 179 items.
Viewed: 1057 times.
Album: Wiring Barn 11
Changed: 01/02/13
Contains: 4 items.
Viewed: 500 times.
Album: Pole changeouts 2012
Changed: 01/02/13
Contains: 49 items.
Viewed: 960 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Schroder Store
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Blog Pics
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Album: Schroder Store
Changed: 12/08/12
Contains: 8 items.
Viewed: 696 times.
Album: Blog Pics
Changed: 12/11/12
Contains: 54 items.
Viewed: 910 times.
Powered by Gallery.
Copyright © 1995-2014, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM