A closer look at the first application of cement. - Pauline Trabert (trabert) Viewed: 1113 times.
|
Mike applies the first batch of concrete to the area in front of the door. - Pauline Trabert (trabert) Viewed: 1137 times.
|
Mike is piecing in more reinforcement in the area where concrete is to be applied. - Pauline Trabert (trabert) Viewed: 1135 times.
|
Birmingham hall after vacuuming. - Pauline Trabert (trabert) Viewed: 1078 times.
|
| | | |
| | | |
|
|
|
|
Mike Baksic applied more metal reinforcement because there wasn't yet enough. - Pauline Trabert (trabert) Viewed: 1102 times.
|
After vacuuming, pieces of metal were placed to hold the concrete to come. - Pauline Trabert (trabert) Viewed: 987 times.
|
Another view of the damage in front of the door in the galley area of the Birmingham prior to vacuuming debris. - Pauline Trabert (trabert) Viewed: 992 times.
|
From the opposite end of the hall looking at the damaged floor to be repaired. - Pauline Trabert (trabert) Viewed: 1032 times.
|
| | | |
| | | |
|
|
|
|
Water got to the wood and it disintegrated over time. - Pauline Trabert (trabert) Viewed: 1010 times.
|
Down to the base after Mike Baksic and Ray Mormann removed the linoleum and wood underneath. - Pauline Trabert (trabert) Viewed: 1030 times.
|
The cabinet was returned to it's place but not installed since it needed to be raised a bit. - Pauline Trabert (trabert) Viewed: 1085 times.
|
Birmingham Floor Work June 15, 2013 - The metal floor was reinstalled. - Pauline Trabert (trabert) Viewed: 1033 times.
|
| | | |
| | | |
|
|
|
|
The metal floor was reinstalled - note that there is a cabinet missing as it probably had been removed when the ice cream parlor had installed the door. - Pauline Trabert (trabert) Viewed: 1075 times.
|
Shelly Vanderschaegen wire wheeling the last piece of the flooring to place - Pauline Trabert (trabert) Viewed: 1015 times.
|
This is the before picture showing the poor condition of the material under the metal floor. - Pauline Trabert (trabert) Viewed: 1018 times.
|
Birmingham Floor Work June 15, 2013 - concrete that Mike and Shelly poured on Friday night - Pauline Trabert (trabert) Viewed: 994 times.
|
| | | |
| | |
|
|
|
Ray Mormann sprayed the floor with a rubberized spray to help preserve the wood under the plywood to be installed next. - Pauline Trabert (trabert) Viewed: 1053 times.
|
After the rubberized spray, plywood was then cut and installed in the car. - Pauline Trabert (trabert) Viewed: 1095 times.
|
Birmingham Floor Work June 15, 2013 - Plywood was cut and installed in the car. - Pauline Trabert (trabert) Viewed: 1264 times.
|
| | |