Atlantic Coast Line Birmingham 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
A closer look at the first application of cement.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike applies the first batch of concrete to the area in front of the door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike is piecing in more reinforcement in the area where concrete is to be applied.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham hall after vacuuming.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
A closer look at the first application of cement. - Pauline Trabert (trabert)
Viewed: 1216 times.
Mike applies the first batch of concrete to the area in front of the door. - Pauline Trabert (trabert)
Viewed: 1236 times.
Mike is piecing in more reinforcement in the area where concrete is to be applied. - Pauline Trabert (trabert)
Viewed: 1242 times.
Birmingham hall after vacuuming. - Pauline Trabert (trabert)
Viewed: 1168 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic applied more metal reinforcement because there wasn't yet enough.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
After vacuuming, pieces of metal were placed to hold the concrete to come.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Another view of the damage in front of the door in the galley area of the Birmingham prior to vacuuming debris.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
From the opposite end of the hall looking at the damaged floor to be repaired.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Mike Baksic applied more metal reinforcement because there wasn't yet enough. - Pauline Trabert (trabert)
Viewed: 1198 times.
After vacuuming, pieces of metal were placed to hold the concrete to come. - Pauline Trabert (trabert)
Viewed: 1087 times.
Another view of the damage in front of the door in the galley area of the Birmingham prior to vacuuming debris. - Pauline Trabert (trabert)
Viewed: 1103 times.
From the opposite end of the hall looking at the damaged floor to be repaired. - Pauline Trabert (trabert)
Viewed: 1129 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Water got to the wood and it disintegrated over time.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Down to the base after Mike Baksic and Ray Mormann removed the linoleum and wood underneath.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The cabinet was returned to it's place but not installed since it needed to be raised a bit.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham Floor Work June 15, 2013 - The metal floor was reinstalled.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Water got to the wood and it disintegrated over time. - Pauline Trabert (trabert)
Viewed: 1115 times.
Down to the base after Mike Baksic and Ray Mormann removed the linoleum and wood underneath. - Pauline Trabert (trabert)
Viewed: 1134 times.
The cabinet was returned to it's place but not installed since it needed to be raised a bit. - Pauline Trabert (trabert)
Viewed: 1190 times.
Birmingham Floor Work June 15, 2013 - The metal floor was reinstalled. - Pauline Trabert (trabert)
Viewed: 1129 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The metal floor was reinstalled - note that there is a cabinet missing as it probably had been removed when the ice cream parlor had installed the door.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shelly Vanderschaegen wire wheeling the last piece of the flooring to place
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
This is the before picture showing the poor condition of the material under the metal floor.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham Floor Work June 15, 2013 - concrete that Mike and Shelly poured on Friday night
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
The metal floor was reinstalled - note that there is a cabinet missing as it probably had been removed when the ice cream parlor had installed the door. - Pauline Trabert (trabert)
Viewed: 1189 times.
Shelly Vanderschaegen wire wheeling the last piece of the flooring to place - Pauline Trabert (trabert)
Viewed: 1109 times.
This is the before picture showing the poor condition of the material under the metal floor. - Pauline Trabert (trabert)
Viewed: 1134 times.
Birmingham Floor Work June 15, 2013 - concrete that Mike and Shelly poured on Friday night - Pauline Trabert (trabert)
Viewed: 1103 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Ray Mormann sprayed the floor with a rubberized spray to help preserve the wood under the plywood to be installed next.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
After the rubberized spray, plywood was then cut and installed in the car.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Birmingham Floor Work June 15, 2013 - Plywood was cut and installed in the car.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Ray Mormann sprayed the floor with a rubberized spray to help preserve the wood under the plywood to be installed next. - Pauline Trabert (trabert)
Viewed: 1157 times.
After the rubberized spray, plywood was then cut and installed in the car. - Pauline Trabert (trabert)
Viewed: 1205 times.
Birmingham Floor Work June 15, 2013 - Plywood was cut and installed in the car. - Pauline Trabert (trabert)
Viewed: 1379 times.
Powered by Gallery.
Copyright © 1995-2025, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM