09.19.07 - THE LEFT SIDE OF THE B TRUCK HAS FINSIH PAINT APPLIED. THREE DECK BOARDS, TWO OF WHICH REQUIRED DADOS, WERE FIT INTO PLACE. THE CABOOSE CABIN HAS HAD ITS SECOND COAT OF FINISH PAINT APPLIED TO THE RIGHT SIDE AND IS NOW READY FOR STENCILING.
- Kirk L. Warner (kwarner)
|