The second jelly jar light was tested successfully on the "A" end - Pauline Trabert (trabert) Viewed: 1257 times.
|
Larry installed the second jelly jar light on the front end of the Dynamometer car - Pauline Trabert (trabert) Viewed: 1296 times.
|
Evacuating the fluid from the heating system with a drill powered pump - Pauline Trabert (trabert) Viewed: 1232 times.
|
Close-up of jelly jar light installed on the kitchen end of the X-5000 - Pauline Trabert (trabert) Viewed: 1256 times.
|
| | | |
| | | |
|
|
|
|
|
The goal of the hose was to drain enough antifreeze to repair a broken pipe - Pauline Trabert (trabert) Viewed: 1259 times.
|
Close-up of Chuck carefully opening the valve to drain the heating system fluid - Pauline Trabert (trabert) Viewed: 1223 times.
|
The jelly jar light on the rear end of the X-5000 was tested and it worked - Larry is happy! - Pauline Trabert (trabert) Viewed: 1218 times.
|
Larry Kuehn installing one of the jelly jar lights on the rear - Pauline Trabert (trabert) Viewed: 1182 times.
|
| | | |
| | | |
|
|
|
|
|
Chuck Trabert used two wrenches to open the boiler drain - Pauline Trabert (trabert) Viewed: 1200 times.
|
Warren Newhauser and Larry Kuehn pause for a smile - Pauline Trabert (trabert) Viewed: 1190 times.
|
Items donated by a railway supply company - Pauline Trabert (trabert) Viewed: 1179 times.
|
Items donated by a railway supply company - Pauline Trabert (trabert) Viewed: 1202 times.
|
| | | |
| | | |
|
|
|
|
|
On Sunday 5/26/13 a second attempt was made to drain the pipe needing repair - Pauline Trabert (trabert) Viewed: 1233 times.
|
Closeup of flashings around the kitchen water tank fill pipe - Pauline Trabert (trabert) Viewed: 1258 times.
|
Soldered seam had popped up causing the leak - Pauline Trabert (trabert) Viewed: 1232 times.
|
Area of leak identified 5/25/13 - above refrigerator - Pauline Trabert (trabert) Viewed: 1435 times.
|
| | | |