| | | |
|
|
|
|
A wall in Bedroom F in the Pacific Peak is also primed - Pauline Trabert (trabert) Viewed: 889 times.
|
Primed room divider in Bedroom F in the Pacific Peak - Pauline Trabert (trabert) Viewed: 878 times.
|
Metal panel Mark Gellman and Michael McCraren pulled from the ceiling in the CNW 9933 RDC - Pauline Trabert (trabert) Viewed: 909 times.
|
Pacific Peak Bedroom F wall - Pauline Trabert (trabert) Viewed: 878 times.
|
| | | |
| | | |
|
|
|
|
Mark Gellman shoveling ice - Pauline Trabert (trabert) Viewed: 898 times.
|
Walk way between Exhibit Cars - Pauline Trabert (trabert) Viewed: 840 times.
|
Exhibit Car brown painted wall - Pauline Trabert (trabert) Viewed: 892 times.
|
Another Ely ceiling view - Pauline Trabert (trabert) Viewed: 902 times.
|
| | | |
| | | |
|
|
|
|
Ely ceiling with Buzz Morisette - Pauline Trabert (trabert) Viewed: 928 times.
|
Jon Habegger took this photo of the finished barrier - Pauline Trabert (trabert) Viewed: 1006 times.
|
Mark captured this image of the Arrival/Departure board - Pauline Trabert (trabert) Viewed: 900 times.
|
Jon Habegger and Mark Gellman work to get the plexiglass into the stained frame - Pauline Trabert (trabert) Viewed: 1013 times.
|
| | | |
| | | |
|
|
|
|
Kevin Kriebs scuffing conduit with Scotch-Briteβ’ β - Pauline Trabert (trabert) Viewed: 898 times.
|
After staining the barrier was put back together - Pauline Trabert (trabert) Viewed: 944 times.
|
Hole in Ely roof near the kitchen - Pauline Trabert (trabert) Viewed: 919 times.
|
7" off from where the conduit is on one end - Pauline Trabert (trabert) Viewed: 888 times.
|
| | | |
| | | |
|
|
|
|
Buzz on the Ely roof checking his pilot holes - Pauline Trabert (trabert) Viewed: 895 times.
|
Buzz drilling a pilot hole through the Ely roof - Pauline Trabert (trabert) Viewed: 979 times.
|
Ray Mormann installing a threshold in the Birmingham - Pauline Trabert (trabert) Viewed: 907 times.
|
Buzz Morisette and Jon Habegger in the Birmingham - Pauline Trabert (trabert) Viewed: 878 times.
|
| | | |