| | | |
|
|
|
|
|
Tubes prepared in the firebox - Nigel Bennett (nbennett) Viewed: 1609 times.
|
Tubes prepared in the smokebox - Nigel Bennett (nbennett) Viewed: 1722 times.
|
Stay heads completed - Nigel Bennett (nbennett) Viewed: 1659 times.
|
Starting to fit the bottom - Nigel Bennett (nbennett) Viewed: 1709 times.
|
| | | |
| | | |
|
|
|
|
|
Critical adjustment - Nigel Bennett (nbennett) Viewed: 1682 times.
|
Smokebox ring drilled for rivets - Nigel Bennett (nbennett) Viewed: 1583 times.
|
Back rivets still to drill - Nigel Bennett (nbennett) Viewed: 1648 times.
|
Lifting the throttle into place - Nigel Bennett (nbennett) Viewed: 1686 times.
|
| | | |
| | | |
|
|
|
|
|
Brian prepares the dome - Nigel Bennett (nbennett) Viewed: 1575 times.
|
Threading the needle - Nigel Bennett (nbennett) Viewed: 1696 times.
|
Careful control from the forklift - Nigel Bennett (nbennett) Viewed: 1588 times.
|
Fittings installed on backhead - Nigel Bennett (nbennett) Viewed: 1634 times.
|
| | | |
| | | |
|
|
|
|
|
Water in the glass - Nigel Bennett (nbennett) Viewed: 1560 times.
|
Full into the dome - Nigel Bennett (nbennett) Viewed: 1797 times.
|
Bucking the staybolt - Nigel Bennett (nbennett) Viewed: 1623 times.
|
Forming the head - Nigel Bennett (nbennett) Viewed: 1645 times.
|
| | | |
| | | |
|
|
|
|
|
Progress on the backhead - Nigel Bennett (nbennett) Viewed: 1672 times.
|
Warming the boiler for hydro - Nigel Bennett (nbennett) Viewed: 1931 times.
|
Support for riveting - Nigel Bennett (nbennett) Viewed: 1648 times.
|
- Nigel Bennett (nbennett) Viewed: 1665 times.
|
| | | |