| | | |
|
|
|
|
Tubes prepared in the firebox - Nigel Bennett (nbennett) Viewed: 1429 times.
|
Tubes prepared in the smokebox - Nigel Bennett (nbennett) Viewed: 1478 times.
|
Stay heads completed - Nigel Bennett (nbennett) Viewed: 1487 times.
|
Starting to fit the bottom - Nigel Bennett (nbennett) Viewed: 1518 times.
|
| | | |
| | | |
|
|
|
|
Critical adjustment - Nigel Bennett (nbennett) Viewed: 1506 times.
|
Smokebox ring drilled for rivets - Nigel Bennett (nbennett) Viewed: 1399 times.
|
Back rivets still to drill - Nigel Bennett (nbennett) Viewed: 1464 times.
|
Lifting the throttle into place - Nigel Bennett (nbennett) Viewed: 1495 times.
|
| | | |
| | | |
|
|
|
|
Brian prepares the dome - Nigel Bennett (nbennett) Viewed: 1379 times.
|
Threading the needle - Nigel Bennett (nbennett) Viewed: 1439 times.
|
Careful control from the forklift - Nigel Bennett (nbennett) Viewed: 1404 times.
|
Fittings installed on backhead - Nigel Bennett (nbennett) Viewed: 1470 times.
|
| | | |
| | | |
|
|
|
|
Water in the glass - Nigel Bennett (nbennett) Viewed: 1381 times.
|
Full into the dome - Nigel Bennett (nbennett) Viewed: 1620 times.
|
Bucking the staybolt - Nigel Bennett (nbennett) Viewed: 1436 times.
|
Forming the head - Nigel Bennett (nbennett) Viewed: 1391 times.
|
| | | |
| | | |
|
|
|
|
Progress on the backhead - Nigel Bennett (nbennett) Viewed: 1490 times.
|
Warming the boiler for hydro - Nigel Bennett (nbennett) Viewed: 1729 times.
|
Support for riveting - Nigel Bennett (nbennett) Viewed: 1447 times.
|
- Nigel Bennett (nbennett) Viewed: 1480 times.
|
| | | |