| | | |
|
|
|
|
|
Tubes prepared in the firebox - Nigel Bennett (nbennett) Viewed: 1734 times.
|
Tubes prepared in the smokebox - Nigel Bennett (nbennett) Viewed: 1849 times.
|
Stay heads completed - Nigel Bennett (nbennett) Viewed: 1777 times.
|
Starting to fit the bottom - Nigel Bennett (nbennett) Viewed: 1829 times.
|
| | | |
| | | |
|
|
|
|
|
Critical adjustment - Nigel Bennett (nbennett) Viewed: 1795 times.
|
Smokebox ring drilled for rivets - Nigel Bennett (nbennett) Viewed: 1706 times.
|
Back rivets still to drill - Nigel Bennett (nbennett) Viewed: 1791 times.
|
Lifting the throttle into place - Nigel Bennett (nbennett) Viewed: 1803 times.
|
| | | |
| | | |
|
|
|
|
|
Brian prepares the dome - Nigel Bennett (nbennett) Viewed: 1672 times.
|
Threading the needle - Nigel Bennett (nbennett) Viewed: 1818 times.
|
Careful control from the forklift - Nigel Bennett (nbennett) Viewed: 1702 times.
|
Fittings installed on backhead - Nigel Bennett (nbennett) Viewed: 1752 times.
|
| | | |
| | | |
|
|
|
|
|
Water in the glass - Nigel Bennett (nbennett) Viewed: 1670 times.
|
Full into the dome - Nigel Bennett (nbennett) Viewed: 1916 times.
|
Bucking the staybolt - Nigel Bennett (nbennett) Viewed: 1738 times.
|
Forming the head - Nigel Bennett (nbennett) Viewed: 1756 times.
|
| | | |
| | | |
|
|
|
|
|
Progress on the backhead - Nigel Bennett (nbennett) Viewed: 1798 times.
|
Warming the boiler for hydro - Nigel Bennett (nbennett) Viewed: 2069 times.
|
Support for riveting - Nigel Bennett (nbennett) Viewed: 1748 times.
|
- Nigel Bennett (nbennett) Viewed: 1792 times.
|
| | | |