| | | |
|
|
|
|
|
Tubes prepared in the firebox - Nigel Bennett (nbennett) Viewed: 1561 times.
|
Tubes prepared in the smokebox - Nigel Bennett (nbennett) Viewed: 1670 times.
|
Stay heads completed - Nigel Bennett (nbennett) Viewed: 1612 times.
|
Starting to fit the bottom - Nigel Bennett (nbennett) Viewed: 1663 times.
|
| | | |
| | | |
|
|
|
|
|
Critical adjustment - Nigel Bennett (nbennett) Viewed: 1632 times.
|
Smokebox ring drilled for rivets - Nigel Bennett (nbennett) Viewed: 1533 times.
|
Back rivets still to drill - Nigel Bennett (nbennett) Viewed: 1601 times.
|
Lifting the throttle into place - Nigel Bennett (nbennett) Viewed: 1637 times.
|
| | | |
| | | |
|
|
|
|
|
Brian prepares the dome - Nigel Bennett (nbennett) Viewed: 1526 times.
|
Threading the needle - Nigel Bennett (nbennett) Viewed: 1655 times.
|
Careful control from the forklift - Nigel Bennett (nbennett) Viewed: 1547 times.
|
Fittings installed on backhead - Nigel Bennett (nbennett) Viewed: 1593 times.
|
| | | |
| | | |
|
|
|
|
|
Water in the glass - Nigel Bennett (nbennett) Viewed: 1516 times.
|
Full into the dome - Nigel Bennett (nbennett) Viewed: 1754 times.
|
Bucking the staybolt - Nigel Bennett (nbennett) Viewed: 1581 times.
|
Forming the head - Nigel Bennett (nbennett) Viewed: 1597 times.
|
| | | |
| | | |
|
|
|
|
|
Progress on the backhead - Nigel Bennett (nbennett) Viewed: 1626 times.
|
Warming the boiler for hydro - Nigel Bennett (nbennett) Viewed: 1879 times.
|
Support for riveting - Nigel Bennett (nbennett) Viewed: 1606 times.
|
- Nigel Bennett (nbennett) Viewed: 1616 times.
|
| | | |