| | | |
|
|
|
|
Tubes prepared in the firebox - Nigel Bennett (nbennett) Viewed: 1454 times.
|
Tubes prepared in the smokebox - Nigel Bennett (nbennett) Viewed: 1512 times.
|
Stay heads completed - Nigel Bennett (nbennett) Viewed: 1511 times.
|
Starting to fit the bottom - Nigel Bennett (nbennett) Viewed: 1547 times.
|
| | | |
| | | |
|
|
|
|
Critical adjustment - Nigel Bennett (nbennett) Viewed: 1532 times.
|
Smokebox ring drilled for rivets - Nigel Bennett (nbennett) Viewed: 1427 times.
|
Back rivets still to drill - Nigel Bennett (nbennett) Viewed: 1495 times.
|
Lifting the throttle into place - Nigel Bennett (nbennett) Viewed: 1523 times.
|
| | | |
| | | |
|
|
|
|
Brian prepares the dome - Nigel Bennett (nbennett) Viewed: 1410 times.
|
Threading the needle - Nigel Bennett (nbennett) Viewed: 1466 times.
|
Careful control from the forklift - Nigel Bennett (nbennett) Viewed: 1433 times.
|
Fittings installed on backhead - Nigel Bennett (nbennett) Viewed: 1494 times.
|
| | | |
| | | |
|
|
|
|
Water in the glass - Nigel Bennett (nbennett) Viewed: 1409 times.
|
Full into the dome - Nigel Bennett (nbennett) Viewed: 1647 times.
|
Bucking the staybolt - Nigel Bennett (nbennett) Viewed: 1465 times.
|
Forming the head - Nigel Bennett (nbennett) Viewed: 1414 times.
|
| | | |
| | | |
|
|
|
|
Progress on the backhead - Nigel Bennett (nbennett) Viewed: 1520 times.
|
Warming the boiler for hydro - Nigel Bennett (nbennett) Viewed: 1758 times.
|
Support for riveting - Nigel Bennett (nbennett) Viewed: 1472 times.
|
- Nigel Bennett (nbennett) Viewed: 1507 times.
|
| | | |