| | | |
|
|
|
|
|
Tubes prepared in the firebox - Nigel Bennett (nbennett) Viewed: 1737 times.
|
Tubes prepared in the smokebox - Nigel Bennett (nbennett) Viewed: 1853 times.
|
Stay heads completed - Nigel Bennett (nbennett) Viewed: 1784 times.
|
Starting to fit the bottom - Nigel Bennett (nbennett) Viewed: 1834 times.
|
| | | |
| | | |
|
|
|
|
|
Critical adjustment - Nigel Bennett (nbennett) Viewed: 1798 times.
|
Smokebox ring drilled for rivets - Nigel Bennett (nbennett) Viewed: 1711 times.
|
Back rivets still to drill - Nigel Bennett (nbennett) Viewed: 1796 times.
|
Lifting the throttle into place - Nigel Bennett (nbennett) Viewed: 1808 times.
|
| | | |
| | | |
|
|
|
|
|
Brian prepares the dome - Nigel Bennett (nbennett) Viewed: 1675 times.
|
Threading the needle - Nigel Bennett (nbennett) Viewed: 1822 times.
|
Careful control from the forklift - Nigel Bennett (nbennett) Viewed: 1705 times.
|
Fittings installed on backhead - Nigel Bennett (nbennett) Viewed: 1757 times.
|
| | | |
| | | |
|
|
|
|
|
Water in the glass - Nigel Bennett (nbennett) Viewed: 1673 times.
|
Full into the dome - Nigel Bennett (nbennett) Viewed: 1922 times.
|
Bucking the staybolt - Nigel Bennett (nbennett) Viewed: 1741 times.
|
Forming the head - Nigel Bennett (nbennett) Viewed: 1760 times.
|
| | | |
| | | |
|
|
|
|
|
Progress on the backhead - Nigel Bennett (nbennett) Viewed: 1801 times.
|
Warming the boiler for hydro - Nigel Bennett (nbennett) Viewed: 2072 times.
|
Support for riveting - Nigel Bennett (nbennett) Viewed: 1752 times.
|
- Nigel Bennett (nbennett) Viewed: 1796 times.
|
| | | |