|
|||||||||||||||||||||
Test hole. High water table problem was solved by using concrete pipe as a casing which kept the walls of the pole holes from caving in. - max tyms (mtyms)
|
![]() |
Copyright © 1995-2025, Illinois Railway Museum. All rights reserved. | Last Modified: 03/28/20 3:52:24 AM |