The mechanisim is rolled out in the open to install the beams for which the table rides on - Matthew Dowd (SteamDepartment) Viewed: 3427 times.
|
Nick Kallas aids the department in installing these beams - Matthew Dowd (SteamDepartment) Viewed: 3286 times.
|
Volunteer Stu tightens the bolts on the top bearing of the table after the installation of the support beams - Matthew Dowd (SteamDepartment) Viewed: 3159 times.
|
The Bay City crane was used to put the table and mechanisim in place durring the summer of '07 - Matthew Dowd (SteamDepartment) Viewed: 3301 times.
|
| | | |
| | | |
|
|
|
|
Shop volunteers asist in guiding the table in place - Matthew Dowd (SteamDepartment) Viewed: 3081 times.
|
The 200' of track beyond the shop was all laid by steam department members - Matthew Dowd (SteamDepartment) Viewed: 3236 times.
|
Steam Team members weld support brackets on the ladder for the drop pit - Matthew Dowd (SteamDepartment) Viewed: 3142 times.
|
Drop table mechanisim is moved into place for installation (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3111 times.
|
| | | |
| | | |
|
|
|
|
Rigging of the table is complete, and the table is finally airborne. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3188 times.
|
Positioning the mechanisim over the pit for the install. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3048 times.
|
Positined over the pit, the mechanisim is ready to be put in. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3009 times.
|
Lowering begins as volunteers guide it in place. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3292 times.
|
| | | |
| | | |
|
|
|
|
Final alignment and positioning. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3250 times.
|
The mechanisim in moved out of the way in order to make the installation of the table easier. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3165 times.
|
Rigging the table for lifting. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3169 times.
|
Positioned over the pit, the table is steadied for lowering. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3152 times.
|
| | | |
| | | |
|
|
|
|
Our resident crane operator watches the load as it is lowered into the pit. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3071 times.
|
Guiding the table into place. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3212 times.
|
The table is in place and the installation is sucessful. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3233 times.
|
The complete table and mechanisim sits in the pit for the first time. (Stuart B. Brosh photo) - Matthew Dowd (SteamDepartment) Viewed: 3769 times.
|
| | | |