|
|||||||||||||||||||||
08.19.09 - THE INTERIOR FLOOR HAS NOW BEEN SANDED AND MUCH OF IT HAS BEEN PRIMED. BEYOND THE TAPE, BOB PAYNE IS PAINTING THE FLOOR WITH FINISH PAINT, AS EVIDENCED BY THE GLOSS. - Kirk L. Warner (kwarner)
|
![]() |
Copyright © 1995-2025, Illinois Railway Museum. All rights reserved. | Last Modified: 03/28/20 3:52:24 AM |