| | | |
|
|
|
|
Overhead work train prepping at Station Tk 1 - Adam Robillard (lzeje657) Viewed: 2113 times.
|
ComEd 4 does the honors of towing the Line Car 604 - Adam Robillard (lzeje657) Viewed: 2074 times.
|
Max and Frank hanging the first roller - Adam Robillard (lzeje657) Viewed: 1997 times.
|
The crew threads the guide rope to pull the wire later on - Adam Robillard (lzeje657) Viewed: 2247 times.
|
| | | |
| | | |
|
|
|
|
Lookin at the rope hanging from the span wires - Adam Robillard (lzeje657) Viewed: 2208 times.
|
Stan was in charge of the 4 today, and did a great job - Adam Robillard (lzeje657) Viewed: 2007 times.
|
The old round wire we are replacing... - Adam Robillard (lzeje657) Viewed: 2061 times.
|
Max pounding out the round wire - Adam Robillard (lzeje657) Viewed: 2009 times.
|
| | | |
| | | |
|
|
|
|
IRM May 20, 2009 024 - Adam Robillard (lzeje657) Viewed: 2023 times.
|
old wire and the guide rope for the new wire - Adam Robillard (lzeje657) Viewed: 2098 times.
|
Tying off the old wire - Adam Robillard (lzeje657) Viewed: 1979 times.
|
screwing up the guide wheels - Adam Robillard (lzeje657) Viewed: 2063 times.
|
| | | |
| | | |
|
|
|
|
the train at Olson Rd - Adam Robillard (lzeje657) Viewed: 2088 times.
|
Bucket truck and line car at the depot - Adam Robillard (lzeje657) Viewed: 1987 times.
|
ComEd 4 on the main - Adam Robillard (lzeje657) Viewed: 1929 times.
|
Placing the new wire in position to begin feeding it through the hangers - Adam Robillard (lzeje657) Viewed: 2037 times.
|
| | | |
| | | |
|
|
|
|
Stan in charge of the reel - Adam Robillard (lzeje657) Viewed: 2045 times.
|
the rope is ready to pull the new wire through the rollers - Adam Robillard (lzeje657) Viewed: 2053 times.
|
old wire tied off out of the way, ready to string the new wire - Adam Robillard (lzeje657) Viewed: 2032 times.
|
Max getting the rope ready at the West Switch - Adam Robillard (lzeje657) Viewed: 2008 times.
|
| | | |