| 
 | |||||||||||||||||||||
| 
 08.02.09 - NEW WOOD NAILERS WERE MADE AND A PROTECTIVE COVER WAS ADDED TO REPLACE THE DAMAGED ONE. THE SEVEN BOLTS STILL NEED TO BE WELDED PRIR TO MORE SIDING BEING ADDED. - Kirk L. Warner (kwarner) 
 
 | |||||||||||||||||||||
|  | 
| Copyright © 1995-2025, Illinois Railway Museum. All rights reserved. | Last Modified: 03/28/20 3:52:24 AM |