| 
  |||||||||||||||||||||
 Finishing off the last of the ties. The next step is to use the tie crane and set each tie out where it'll be installed. 3-13-11 - Adam Robillard (lzeje657) 
 
  | 
  |||||||||||||||||||||
| Copyright © 1995-2025, Illinois Railway Museum. All rights reserved. | Last Modified: 03/28/20 3:52:24 AM |