| | | |
|
|
|
|
The trailer starts to move clear - Nigel Bennett (nbennett) Viewed: 2013 times.
|
and pulls the trucks into place - Nigel Bennett (nbennett) Viewed: 2021 times.
|
Planer bed now reconditioned - Nigel Bennett (nbennett) Viewed: 1963 times.
|
The new compressor ready for mounting - Nigel Bennett (nbennett) Viewed: 1841 times.
|
| | | |
| | | |
|
|
|
|
Stu and Bob work on planer parts - Nigel Bennett (nbennett) Viewed: 1894 times.
|
Control electrics being assembled for planer - Nigel Bennett (nbennett) Viewed: 1885 times.
|
Valve block back in place - Nigel Bennett (nbennett) Viewed: 1968 times.
|
Scissor lift for air system installation - Nigel Bennett (nbennett) Viewed: 1897 times.
|
| | | |
| | | |
|
|
|
|
Aerial view of the shop - Nigel Bennett (nbennett) Viewed: 2043 times.
|
Aerial view of shop (2) - Nigel Bennett (nbennett) Viewed: 1921 times.
|
Reassembling the planer - Nigel Bennett (nbennett) Viewed: 1867 times.
|
McCabe in new location - Nigel Bennett (nbennett) Viewed: 1918 times.
|
| | | |
| | | |
|
|
|
|
Dennis at work on the lathe gear - Nigel Bennett (nbennett) Viewed: 1853 times.
|
That looks like it ! - Nigel Bennett (nbennett) Viewed: 1789 times.
|
The finished lathe gear - Nigel Bennett (nbennett) Viewed: 1906 times.
|
Jeff starts installing the air system - Nigel Bennett (nbennett) Viewed: 1849 times.
|
| | | |
| | | |
|
|
|
|
Album: Non IRM SteamChanged: 10/25/15
Contains: 10 items. Viewed: 2283 times.
|
Lathe gearing in place - Nigel Bennett (nbennett) Viewed: 1752 times.
|
Stu setting the planer - Nigel Bennett (nbennett) Viewed: 1790 times.
|
Jeff fits the new air supply - Nigel Bennett (nbennett) Viewed: 1867 times.
|
| | | |