Roger works on using a dye to clean up the bolts for the HEP cooling hatch. - Eric Zabelny (ericz) Viewed: 3966 times.
|
The gasket material that was applied to the HEP cooling hatch - Eric Zabelny (ericz) Viewed: 4208 times.
|
The other Roger works at drilling and tapping the holes for the HEP cooling hatch - Eric Zabelny (ericz) Viewed: 4268 times.
|
| | |
| | |
|
|
|
Metra 305/CNW 411 is in position to have its HEP cooling hatch reinstalled - Eric Zabelny (ericz) Viewed: 6296 times.
|
Let the installation begin - Eric Zabelny (ericz) Viewed: 4361 times.
|
The crew gets the hatch in position - Eric Zabelny (ericz) Viewed: 4082 times.
|
| | |
| | |
|
|
|
Contemplating our next move to get the hatch level without damaging its components - Eric Zabelny (ericz) Viewed: 4277 times.
|
- Ted Krafcky (TedKrafcky) Viewed: 4148 times.
|
- Ted Krafcky (TedKrafcky) Viewed: 4291 times.
|
| | |
| | |
|
|
|
Lowering the hatch into position - Eric Zabelny (ericz) Viewed: 4692 times.
|
Rats eye view of the installation - Eric Zabelny (ericz) Viewed: 4254 times.
|
Work continues - Eric Zabelny (ericz) Viewed: 4535 times.
|
| | |
| | |
|
|
|
- Ted Krafcky (TedKrafcky) Viewed: 4433 times.
|
Almost there... - Eric Zabelny (ericz) Viewed: 4827 times.
|
Now thats dedication... Getting the hatch in position... - Eric Zabelny (ericz) Viewed: 4873 times.
|
| | |
| | |
|
|
|
- Ted Krafcky (TedKrafcky) Viewed: 4407 times.
|
Just about done,, making final adjustments - Eric Zabelny (ericz) Viewed: 6345 times.
|
The work gang on Sunday, very proud of their work accomplished - Eric Zabelny (ericz) Viewed: 6502 times.
|
| | |