Roger works on using a dye to clean up the bolts for the HEP cooling hatch. - Eric Zabelny (ericz) Viewed: 3842 times.
|
The gasket material that was applied to the HEP cooling hatch - Eric Zabelny (ericz) Viewed: 4068 times.
|
The other Roger works at drilling and tapping the holes for the HEP cooling hatch - Eric Zabelny (ericz) Viewed: 4120 times.
|
| | |
| | |
|
|
|
Metra 305/CNW 411 is in position to have its HEP cooling hatch reinstalled - Eric Zabelny (ericz) Viewed: 6109 times.
|
Let the installation begin - Eric Zabelny (ericz) Viewed: 4213 times.
|
The crew gets the hatch in position - Eric Zabelny (ericz) Viewed: 3951 times.
|
| | |
| | |
|
|
|
Contemplating our next move to get the hatch level without damaging its components - Eric Zabelny (ericz) Viewed: 4144 times.
|
- Ted Krafcky (TedKrafcky) Viewed: 4013 times.
|
- Ted Krafcky (TedKrafcky) Viewed: 4146 times.
|
| | |
| | |
|
|
|
Lowering the hatch into position - Eric Zabelny (ericz) Viewed: 4555 times.
|
Rats eye view of the installation - Eric Zabelny (ericz) Viewed: 4129 times.
|
Work continues - Eric Zabelny (ericz) Viewed: 4420 times.
|
| | |
| | |
|
|
|
- Ted Krafcky (TedKrafcky) Viewed: 4303 times.
|
Almost there... - Eric Zabelny (ericz) Viewed: 4654 times.
|
Now thats dedication... Getting the hatch in position... - Eric Zabelny (ericz) Viewed: 4739 times.
|
| | |
| | |
|
|
|
- Ted Krafcky (TedKrafcky) Viewed: 4268 times.
|
Just about done,, making final adjustments - Eric Zabelny (ericz) Viewed: 6196 times.
|
The work gang on Sunday, very proud of their work accomplished - Eric Zabelny (ericz) Viewed: 6336 times.
|
| | |