Mainline Culvert Work on 9-1-2007  

FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
As a temporary repair, we place some large aluminum plates around the breach, and a smaller one over the top of the two sections.  Then placed some large stone and concrete chunks on top.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME

As a temporary repair, we place some large aluminum plates around the breach, and a smaller one over the top of the two sections. Then placed some large stone and concrete chunks on top. - James Kolanowski (jamesk)