CRIP 19135 TRANSFER CABOOSE  

transpixel
transpixel 05.23.07 - THE SIDING ON THE SOUTH SIDE IS NOW COMPLETE AND ALL BOLTS ARE IN PLACE.  THE WINDOW IS RESTORED AND IS BOLTED IN PLACE.  THE FIT-UP OF THE FINAL BOARDS ON THE "A" END IS COMMENCING. transpixel
transpixel

05.23.07 - THE SIDING ON THE SOUTH SIDE IS NOW COMPLETE AND ALL BOLTS ARE IN PLACE. THE WINDOW IS RESTORED AND IS BOLTED IN PLACE. THE FIT-UP OF THE FINAL BOARDS ON THE "A" END IS COMMENCING. - Kirk L. Warner (kwarner)