|
|||||||||||||||||||||
08.26.07 - BOTH THE L3 AND L4 BOXES HAVE BEEN REPACKED AND THE NEW LID SEALS HAVE BEEN APPLIED. THE L4 JOURNAL BOX LID WAS ALSO REPAIRED. - Kirk L. Warner (kwarner)
|
![]() |
Copyright © 1995-2025, Illinois Railway Museum. All rights reserved. | Last Modified: 03/28/20 3:52:24 AM |