| | | |
|
|
|
|
|
Rivet test heated - Nigel Bennett (nbennett) Viewed: 1643 times.
|
A lot of tubes ground to size - Nigel Bennett (nbennett) Viewed: 1603 times.
|
Wires for lagging in place on boiler barrel - Nigel Bennett (nbennett) Viewed: 1639 times.
|
Eric takes a break from tube grinding - Nigel Bennett (nbennett) Viewed: 1607 times.
|
| | | |
| | | |
|
|
|
|
|
Rivets to be fitted - Nigel Bennett (nbennett) Viewed: 1648 times.
|
Two done at the front - Nigel Bennett (nbennett) Viewed: 1573 times.
|
Four complete at the front - Nigel Bennett (nbennett) Viewed: 1677 times.
|
The hot rivet is placed - Nigel Bennett (nbennett) Viewed: 1556 times.
|
| | | |
| | | |
|
|
|
|
|
Air hammer goes on - Nigel Bennett (nbennett) Viewed: 1621 times.
|
Hammering complete - see how far it is compressed - Nigel Bennett (nbennett) Viewed: 1656 times.
|
The finished rivet head - Nigel Bennett (nbennett) Viewed: 1551 times.
|
Ten in place three to go - Nigel Bennett (nbennett) Viewed: 1571 times.
|
| | | |
| | | |
|
|
|
|
|
Work starts on the smokebox ring - Nigel Bennett (nbennett) Viewed: 1630 times.
|
Paul works on the smokebox front - Nigel Bennett (nbennett) Viewed: 1696 times.
|
First fittings on the backhead - Nigel Bennett (nbennett) Viewed: 1533 times.
|
Engineer's glass in place - Nigel Bennett (nbennett) Viewed: 1576 times.
|
| | | |
| | | |
|
|
|
|
|
All rivets in place - Nigel Bennett (nbennett) Viewed: 1605 times.
|
Main control valve for the turret - Nigel Bennett (nbennett) Viewed: 1537 times.
|
Body of the turret valve - Nigel Bennett (nbennett) Viewed: 1544 times.
|
Valve seat in the turret - Nigel Bennett (nbennett) Viewed: 1621 times.
|
| | | |