Rivet test heated - Nigel Bennett (nbennett) Viewed: 1706 times.
|
A lot of tubes ground to size - Nigel Bennett (nbennett) Viewed: 1661 times.
|
Wires for lagging in place on boiler barrel - Nigel Bennett (nbennett) Viewed: 1691 times.
|
Eric takes a break from tube grinding - Nigel Bennett (nbennett) Viewed: 1672 times.
|
| | | |
| | | |
|
|
|
|
|
Rivets to be fitted - Nigel Bennett (nbennett) Viewed: 1707 times.
|
Two done at the front - Nigel Bennett (nbennett) Viewed: 1626 times.
|
Four complete at the front - Nigel Bennett (nbennett) Viewed: 1746 times.
|
The hot rivet is placed - Nigel Bennett (nbennett) Viewed: 1619 times.
|
| | | |
| | | |
|
|
|
|
|
Air hammer goes on - Nigel Bennett (nbennett) Viewed: 1686 times.
|
Hammering complete - see how far it is compressed - Nigel Bennett (nbennett) Viewed: 1719 times.
|
The finished rivet head - Nigel Bennett (nbennett) Viewed: 1605 times.
|
Ten in place three to go - Nigel Bennett (nbennett) Viewed: 1632 times.
|
| | | |
| | | |
|
|
|
|
|
Work starts on the smokebox ring - Nigel Bennett (nbennett) Viewed: 1704 times.
|
Paul works on the smokebox front - Nigel Bennett (nbennett) Viewed: 1754 times.
|
First fittings on the backhead - Nigel Bennett (nbennett) Viewed: 1590 times.
|
Engineer's glass in place - Nigel Bennett (nbennett) Viewed: 1637 times.
|
| | | |
| | | |
|
|
|
|
|
All rivets in place - Nigel Bennett (nbennett) Viewed: 1671 times.
|
Main control valve for the turret - Nigel Bennett (nbennett) Viewed: 1601 times.
|
Body of the turret valve - Nigel Bennett (nbennett) Viewed: 1614 times.
|
Valve seat in the turret - Nigel Bennett (nbennett) Viewed: 1684 times.
|
| | | |