Rivet test heated - Nigel Bennett (nbennett) Viewed: 1344 times.
|
A lot of tubes ground to size - Nigel Bennett (nbennett) Viewed: 1370 times.
|
Wires for lagging in place on boiler barrel - Nigel Bennett (nbennett) Viewed: 1405 times.
|
Eric takes a break from tube grinding - Nigel Bennett (nbennett) Viewed: 1356 times.
|
| | | |
| | | |
|
|
|
|
Rivets to be fitted - Nigel Bennett (nbennett) Viewed: 1395 times.
|
Two done at the front - Nigel Bennett (nbennett) Viewed: 1352 times.
|
Four complete at the front - Nigel Bennett (nbennett) Viewed: 1400 times.
|
The hot rivet is placed - Nigel Bennett (nbennett) Viewed: 1300 times.
|
| | | |
| | | |
|
|
|
|
Air hammer goes on - Nigel Bennett (nbennett) Viewed: 1347 times.
|
Hammering complete - see how far it is compressed - Nigel Bennett (nbennett) Viewed: 1385 times.
|
The finished rivet head - Nigel Bennett (nbennett) Viewed: 1324 times.
|
Ten in place three to go - Nigel Bennett (nbennett) Viewed: 1352 times.
|
| | | |
| | | |
|
|
|
|
Work starts on the smokebox ring - Nigel Bennett (nbennett) Viewed: 1361 times.
|
Paul works on the smokebox front - Nigel Bennett (nbennett) Viewed: 1475 times.
|
First fittings on the backhead - Nigel Bennett (nbennett) Viewed: 1299 times.
|
Engineer's glass in place - Nigel Bennett (nbennett) Viewed: 1355 times.
|
| | | |
| | | |
|
|
|
|
All rivets in place - Nigel Bennett (nbennett) Viewed: 1396 times.
|
Main control valve for the turret - Nigel Bennett (nbennett) Viewed: 1310 times.
|
Body of the turret valve - Nigel Bennett (nbennett) Viewed: 1310 times.
|
Valve seat in the turret - Nigel Bennett (nbennett) Viewed: 1350 times.
|
| | | |