| | | |
|
|
|
|
|
Rivet test heated - Nigel Bennett (nbennett) Viewed: 1520 times.
|
A lot of tubes ground to size - Nigel Bennett (nbennett) Viewed: 1493 times.
|
Wires for lagging in place on boiler barrel - Nigel Bennett (nbennett) Viewed: 1523 times.
|
Eric takes a break from tube grinding - Nigel Bennett (nbennett) Viewed: 1483 times.
|
| | | |
| | | |
|
|
|
|
|
Rivets to be fitted - Nigel Bennett (nbennett) Viewed: 1534 times.
|
Two done at the front - Nigel Bennett (nbennett) Viewed: 1456 times.
|
Four complete at the front - Nigel Bennett (nbennett) Viewed: 1542 times.
|
The hot rivet is placed - Nigel Bennett (nbennett) Viewed: 1427 times.
|
| | | |
| | | |
|
|
|
|
|
Air hammer goes on - Nigel Bennett (nbennett) Viewed: 1479 times.
|
Hammering complete - see how far it is compressed - Nigel Bennett (nbennett) Viewed: 1543 times.
|
The finished rivet head - Nigel Bennett (nbennett) Viewed: 1436 times.
|
Ten in place three to go - Nigel Bennett (nbennett) Viewed: 1468 times.
|
| | | |
| | | |
|
|
|
|
|
Work starts on the smokebox ring - Nigel Bennett (nbennett) Viewed: 1519 times.
|
Paul works on the smokebox front - Nigel Bennett (nbennett) Viewed: 1593 times.
|
First fittings on the backhead - Nigel Bennett (nbennett) Viewed: 1421 times.
|
Engineer's glass in place - Nigel Bennett (nbennett) Viewed: 1467 times.
|
| | | |
| | | |
|
|
|
|
|
All rivets in place - Nigel Bennett (nbennett) Viewed: 1503 times.
|
Main control valve for the turret - Nigel Bennett (nbennett) Viewed: 1423 times.
|
Body of the turret valve - Nigel Bennett (nbennett) Viewed: 1430 times.
|
Valve seat in the turret - Nigel Bennett (nbennett) Viewed: 1495 times.
|
| | | |