Feeding a SH element into position - Nigel Bennett (nbennett) Viewed: 1542 times.
|
Fitting a SH element into the header - Nigel Bennett (nbennett) Viewed: 1547 times.
|
SH element in position - Nigel Bennett (nbennett) Viewed: 1488 times.
|
Fitting the last row - Nigel Bennett (nbennett) Viewed: 1622 times.
|
| | | |
| | | |
|
|
|
|
|
The super heater is complete - Nigel Bennett (nbennett) Viewed: 1505 times.
|
Eric and Evelina lagging the boiler - Nigel Bennett (nbennett) Viewed: 1636 times.
|
Lagging blocks in place - Nigel Bennett (nbennett) Viewed: 1434 times.
|
Two sections complete - Nigel Bennett (nbennett) Viewed: 1551 times.
|
| | | |
| | | |
|
|
|
|
|
Rick starts to build clay on firehole - Nigel Bennett (nbennett) Viewed: 1537 times.
|
Door casting ready to fit - Nigel Bennett (nbennett) Viewed: 1495 times.
|
Steady progress on boiler lagging - Nigel Bennett (nbennett) Viewed: 1446 times.
|
Cab window repaired - Nigel Bennett (nbennett) Viewed: 1472 times.
|
| | | |
| | | |
|
|
|
|
|
Firebox door casting in place - Nigel Bennett (nbennett) Viewed: 1543 times.
|
Dennis cuts sheet for the smokebox - Nigel Bennett (nbennett) Viewed: 1486 times.
|
This shows why new sheet is required - Nigel Bennett (nbennett) Viewed: 1575 times.
|
Cleaning valves seats in the air compressor - Nigel Bennett (nbennett) Viewed: 1476 times.
|
| | | |
| | | |
|
|
|
|
|
Collin applies insulating mud to the backhead - Nigel Bennett (nbennett) Viewed: 1409 times.
|
Fitting sheet metal to the backhead - Nigel Bennett (nbennett) Viewed: 1459 times.
|
Main sheets in place - Nigel Bennett (nbennett) Viewed: 1440 times.
|
First sheet metal on the boiler - Nigel Bennett (nbennett) Viewed: 1706 times.
|
| | | |