Trackwork April 16, 2008 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Paul workin' the second tie loose
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Track lifted before getting broomed
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
We are joined by a visitor (in the truck..)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Paul Krot from California getting a feel for the crane
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Paul workin' the second tie loose - Adam Robillard (lzeje657)
Viewed: 1991 times.
Track lifted before getting broomed - Adam Robillard (lzeje657)
Viewed: 1855 times.
We are joined by a visitor (in the truck..) - Adam Robillard (lzeje657)
Viewed: 1869 times.
Paul Krot from California getting a feel for the crane - Adam Robillard (lzeje657)
Viewed: 1875 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Paul at the controls - He got the hang of it quick!
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Workin' to get the tie removed
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Frank loosening ballast around the tie to be removed
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
lifted about 5" out of a sag...
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Paul at the controls - He got the hang of it quick! - Adam Robillard (lzeje657)
Viewed: 1733 times.
Workin' to get the tie removed - Adam Robillard (lzeje657)
Viewed: 1815 times.
Frank loosening ballast around the tie to be removed - Adam Robillard (lzeje657)
Viewed: 1903 times.
lifted about 5" out of a sag... - Adam Robillard (lzeje657)
Viewed: 1879 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The track is raised, final job is replace 2 ties under a joint
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Paul uses the tie crane to remove the dirt, also known as ties
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
lifted the joints about 3" out of a sag
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Raised and tamped between the switch points and diamond
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
The track is raised, final job is replace 2 ties under a joint - Adam Robillard (lzeje657)
Viewed: 1913 times.
Paul uses the tie crane to remove the dirt, also known as ties - Adam Robillard (lzeje657)
Viewed: 1853 times.
lifted the joints about 3" out of a sag - Adam Robillard (lzeje657)
Viewed: 1928 times.
Raised and tamped between the switch points and diamond - Adam Robillard (lzeje657)
Viewed: 1852 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
EJ&E 585 and tool cart sit on the "west leg of the tail track wye"
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Frank shows our visitor, Paul, the controls of the tie crane
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
EJ&E 585 and tool cart sit on the "west leg of the tail track wye" - Adam Robillard (lzeje657)
Viewed: 1877 times.
Frank shows our visitor, Paul, the controls of the tie crane - Adam Robillard (lzeje657)
Viewed: 1965 times.
Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM