Album: Trackwork - March 29, 2008Working on track defects along the mainline as well as inspection the the East End after the trees were chopped down. Anyone need firewood? Changed: 11/15/09
Contains: 18 items. Viewed: 4104 times.
|
| | | |
| |
|
|
Album: Trackwork April 16, 2008Frank D, Paul Krot (Orange Empire Railway Museum), and myself hand jack and tamp the approaches to the carline diamond. We also replaced two ties under a joint before sunset on a warm Wednesday afternoon. Changed: 11/15/09