| | | |
|
|
|
|
|
Adam running the 6000 - Frank Devries (icemancne) Viewed: 1773 times.
|
DSC 0180 - Frank Devries (icemancne) Viewed: 1658 times.
|
DSC 0176 - Frank Devries (icemancne) Viewed: 1758 times.
|
Gun tamping the low spots in the barn. - Frank Devries (icemancne) Viewed: 1667 times.
|
| | | |
| | | |
|
|
|
|
|
Phil running the compressor into the barn for spot tamping. - Frank Devries (icemancne) Viewed: 1671 times.
|
Dave gets some training on the tie crane. - Frank Devries (icemancne) Viewed: 1625 times.
|
Dave and Evan inspect the work - Frank Devries (icemancne) Viewed: 1759 times.
|
After lifting comes gun tamping, as the inspector checks the work - Frank Devries (icemancne) Viewed: 1678 times.
|
| | | |
| | | |
|
|
|
|
|
Jack leveling the 31/32 switch. It was all jacked up! - Frank Devries (icemancne) Viewed: 1667 times.
|
Dead Switch Timbers from the Yard 3 switch - Frank Devries (icemancne) Viewed: 1655 times.
|
Tamper crew continues to troubleshoot.... - Frank Devries (icemancne) Viewed: 1588 times.
|
DSC 0142 - Frank Devries (icemancne) Viewed: 1571 times.
|
| | | |
| | | |
|
|
|
|
|
DSC 0139 - Frank Devries (icemancne) Viewed: 1692 times.
|
DSC 0130 - Frank Devries (icemancne) Viewed: 1687 times.
|
DSC 0126 - Frank Devries (icemancne) Viewed: 1733 times.
|
First day of panel install - Half way done. - Frank Devries (icemancne) Viewed: 1662 times.
|
| | | |
| | | |
|
|
|
|
|
First stack of panels are now in the barn. - Frank Devries (icemancne) Viewed: 1745 times.
|
First panel in on track 31. - Frank Devries (icemancne) Viewed: 1642 times.
|
Mark and Tim bolt up the temp comp joint to tie the first new panel of track into track 31. - Frank Devries (icemancne) Viewed: 1789 times.
|
Gauge issues required jacks to get the first joints put together. Mark doing the honors. - Frank Devries (icemancne) Viewed: 1637 times.
|
| | | |