| | | |
|
|
|
|
Making temporary comp bars to tie the new rail into the old. These will be replaced when we replace the rail outside the barn. - Frank Devries (icemancne) Viewed: 1070 times.
|
Just one of a multitude of defects on 31 track.
- Frank Devries (icemancne) Viewed: 1016 times.
|
80lb rail at the ready for the rebuild.
- Frank Devries (icemancne) Viewed: 988 times.
|
Side dump in service. - Frank Devries (icemancne) Viewed: 1056 times.
|
| | | |
| | | |
|
|
|
|
Mark and Adam stacking rail for the 31 track project.
- Frank Devries (icemancne) Viewed: 1025 times.
|
Mark running the crane for stacking. - Frank Devries (icemancne) Viewed: 998 times.
|
DSC 0230 - Frank Devries (icemancne) Viewed: 1005 times.
|
The rail pile after dumping.
- Frank Devries (icemancne) Viewed: 1072 times.
|
| | | |
|
|
Loaded gon, one step closer to it's road trip. - Frank Devries (icemancne) Viewed: 1275 times.
|
|