Making temporary comp bars to tie the new rail into the old. These will be replaced when we replace the rail outside the barn. - Frank Devries (icemancne) Viewed: 1247 times.
|
Just one of a multitude of defects on 31 track.
- Frank Devries (icemancne) Viewed: 1180 times.
|
80lb rail at the ready for the rebuild.
- Frank Devries (icemancne) Viewed: 1160 times.
|
Side dump in service. - Frank Devries (icemancne) Viewed: 1253 times.
|
| | | |
| | | |
|
|
|
|
|
Mark and Adam stacking rail for the 31 track project.
- Frank Devries (icemancne) Viewed: 1205 times.
|
Mark running the crane for stacking. - Frank Devries (icemancne) Viewed: 1170 times.
|
DSC 0230 - Frank Devries (icemancne) Viewed: 1190 times.
|
The rail pile after dumping.
- Frank Devries (icemancne) Viewed: 1265 times.
|
| | | |
|
|
|
Loaded gon, one step closer to it's road trip. - Frank Devries (icemancne) Viewed: 1476 times.
|
|