SLSF (fFrisco) 1630 sits over the pit for the first time in late summer '07 - Matthew Dowd (SteamDepartment) Viewed: 590 times.
|
Volunteers standy ready to asist in the drop - Matthew Dowd (SteamDepartment) Viewed: 521 times.
|
The box binder shown here had to be removed prior to the drop of the fifth axle in order to premit the box to slide freely out of the frame - Matthew Dowd (SteamDepartment) Viewed: 467 times.
|
The connecting rod between the #4 axle and #5 axle was also removed to free the wheelset from the running gear - Matthew Dowd (SteamDepartment) Viewed: 466 times.
|
| | | |
| | | |
|
|
|
|
|
Steam department volunteer Colin crawled in between the frame of the locomotive to watch for potential problems durring the drop - Matthew Dowd (SteamDepartment) Viewed: 510 times.
|
Bill enables the mechanisim for its first use at IRM - Matthew Dowd (SteamDepartment) Viewed: 471 times.
|
The table was first used to lift the rear axle to block the spring rigging - Matthew Dowd (SteamDepartment) Viewed: 502 times.
|
Rick blocks the springs - Matthew Dowd (SteamDepartment) Viewed: 494 times.
|
| | | |
| |
|
|
|
The locomotive casts a shadow on barn 9 as prep for the drop is completed in the late summer light - Matthew Dowd (SteamDepartment) Viewed: 479 times.
|
Sitting in the shop after the sucessful drop - Matthew Dowd (SteamDepartment) Viewed: 553 times.
|
| |