CRIP 19135 TRANSFER CABOOSE  

transpixel
transpixel 01.03.07 - MORE NEW WOOD HAS BEEN APPLIED OVER THE DOOR.  THE FINAL PIECE WILL BE MADE AND ADDED IN LATE SPRING 2007. THE NEW INTERIOR DOOR SUPPORTS WILL BE MADE AND ALL OF THE HORIZONTAL WOOD WILL BE LINED UP AND SECURED.  THE FIRST GRAB IRON ON THIS END HAS BEEN APPLIED.  HORIZONTAL WOOD WILL BE LINED UP AND SECURED.  transpixel
transpixel

01.03.07 - MORE NEW WOOD HAS BEEN APPLIED OVER THE DOOR. THE FINAL PIECE WILL BE MADE AND ADDED IN LATE SPRING 2007. THE NEW INTERIOR DOOR SUPPORTS WILL BE MADE AND ALL OF THE HORIZONTAL WOOD WILL BE LINED UP AND SECURED. THE FIRST GRAB IRON ON THIS END HAS BEEN APPLIED. HORIZONTAL WOOD WILL BE LINED UP AND SECURED. - Kirk L. Warner (kwarner)


Powered by Gallery.
Copyright © 1995-2024, Illinois Railway Museum. All rights reserved. Last Modified: 03/28/20 3:52:24 AM