11.28.07 - VICTOR HUMPHREYS IS TIGHTENING THE DRAIN PIPES FOR THE OVERFLOW OF THE DRINKING WATER DISPENSER. - Kirk L. Warner (kwarner) Viewed: 1479 times.
|
11.28.07 - KIRK WARNER IS STRIPPING THE PAINT FROM THE WATER CHILLER WHICH WILL FIT INTO THE BRACKET WHICH WAS JUST INSTALLED. ICE IS PUT INTO THIS PIECE AND IT COOLS THE DRINKING WATER. - Kirk L. Warner (kwarner) Viewed: 1519 times.
|
11.28.07 - THE FIRST OF TWO SEAT FRAMES HAS BEEN INSTALLED. THEY NOW "WALK-OVER" PROPERLY WITH THE ADDED SPACER. - Kirk L. Warner (kwarner) Viewed: 1621 times.
|
11.28.07 - VICTOR HUMPHREYS TRIES OUT THE SEAT THAT HE AND KIRK WARNER HAVE JUST INSTALLED. - Kirk L. Warner (kwarner) Viewed: 1553 times.
|
| | | |
| | | |
|
|
|
|
11.28.07 - VICTOR HUMPHREYS APPLIES THE FIRST COAT OF FINSIH PAINT TO THE LEFT SIDE FLOOR. - Kirk L. Warner (kwarner) Viewed: 1463 times.
|
12.01.07- THE ICE CHEST AND TOP HAVE HAD THE PAINT STRIPPED OR SANDED AND HAS BEEN PRIMED PRIOR TO FINAL PAINTING. - Kirk L. Warner (kwarner) Viewed: 1472 times.
|
12.01.07 - THE BRAKE ROD WHICH WAS REPAIRED HAS BEEN PRIMED AND IS READY FOR FINAL PAINTING. - Kirk L. Warner (kwarner) Viewed: 1467 times.
|
12.02.07 - VICTOR HUMPHREYS INTALLS THE FLARE HOLDER WHICH HE HAS REPAINTED. - Kirk L. Warner (kwarner) Viewed: 1749 times.
|
| | | |
| | | |
|
|
|
|
12.02.07 - THE ICE CHEST HAS HAD ITS FIRST COAT OF FINISH PAINT APPLIED. THE BRAKE ROD HAD ITS FINISH COAT OF PAINT APPLIED. - Kirk L. Warner (kwarner) Viewed: 1474 times.
|
12.02.07 - KIRK WARNER HAS APPLIED MUCH OF THE PRIMED QUARTER ROUND TRIM. THE SECOND SEAT FRAME HAS BEEN INSTALLED. - Kirk L. Warner (kwarner) Viewed: 1447 times.
|
12.05.07 - THE SECOND SEAT HAS BEEN INSTALLED. - Kirk L. Warner (kwarner) Viewed: 1426 times.
|
12.08.07 - THE QUARTER ROUND ON THE A END HAS BEEN PAINTED. THE ICE CHEST HAS BEEN INSTALLED. - Kirk L. Warner (kwarner) Viewed: 1515 times.
|
| | | |
| | | |
|
|
|
|
12.08.07 - THE CEILING HAS BEEN PATCHED IN AT THE VERTICAL DOOR SUPPORTS. ALL OF THE REMAINING QUARTER ROUND HAS BEEN PRIMED AND INSTALLED. NOTE THE ICE ON THE DOOR WINDOW PANES. IT IS 16 DEGREES OUTSIDE. - Kirk L. Warner (kwarner) Viewed: 1427 times.
|
12.08.07 - THE REPAIRED AND PAINTED BRAKE ROD HAS BEEN INSTALLED. - Kirk L. Warner (kwarner) Viewed: 1429 times.
|
12.09.07 - THE HEAT SHIELD AND THE DAMPER HAVE BEEN PRIMED. ALL OF THE QUARTER ROUND APPLIED YESTERDAY WAS PAINTED WITH A FINISH COAT OF COLOR. - Kirk L. Warner (kwarner) Viewed: 1406 times.
|
12.09.07 - THE WATER COOLER HAS BEEN POLISHED AND APPLIED TO ITS HOLDER. THE WATER BOTTLE AND ITS SUPPORT5 BRACKET REMAINS TO BE APPLIED. - Kirk L. Warner (kwarner) Viewed: 1499 times.
|
| | | |
| | | |
|
|
|
|
12.09.07 - THE A END THRESHOLD HAS BEEN MADE. BOTH THRESHOLDS NOW HAVE FINSH PAINT APPLIED. THE FUEL FILTER ASSEMBLY HAS BEEN FINSH PAINTED AND IS READY TO APPLY. - Kirk L. Warner (kwarner) Viewed: 1496 times.
|
12.12.07 - THE A END THRESHOLD HAS BEEN ISNTALLED. AFTER THIS, THE DIAMOND PLATE ON THE A END WAS ANCHORED TO THE FLOOR. THE B END THRESHOLD WAS INSTALLED LATER IN THE DAY. - Kirk L. Warner (kwarner) Viewed: 1464 times.
|
12.12.07 - KIRK WARNER APPLIES THE DOOR FRAME TRIM PIECES TO THE A END AS VICTOR HUMPHREYS LOOKS ON. BOTH THE A AND B END DOOR TRIM PIECES WERE INSTALLED TODAY. - Kirk L. Warner (kwarner) Viewed: 1458 times.
|
12.12.07 - THE FUEL FILTER AND BRACKET WERE APPLIED, AS WELL AS THE LINES CONNECTING THE FILTER TO THE TANK AND HEATER. THE ICE BOX DRAIN WAS APPLIED AND THE ICE BOX WAS ANCHORED TO THE FLOOR. - Kirk L. Warner (kwarner) Viewed: 1626 times.
|
| | | |